河南中孚实业有限公司288m2五电场电除尘器安装工程施工.doc
施 工 组 织 设 计
一、编制说明及现场要求
二、现场要求
三、现场设备布置:
四、施工人员和组织机构:
五、施工前的准备工作:
六、施工的程序,方法及内容:
七、质检目项及质量要求
八、电气工程施工
九、验收节点
十、安全要求和措施
附:电除尘器吊装机械布置平面图
Organization Design Works
1, description and site preparation requirements
Second, on-site requirements
Third, on-site facility layout:
4, construction workers and organizations:
5, pre-construction preparation:
6, construction procedures, methods and content:
7, quality inspection and quality requirements for project items
8, electrical construction
9, acceptance node
10, security requirements and measures
Attachment: ESP hoisting machinery layout plan