电厂(2×450MW)主厂房工程1#、2#汽轮发电机基础工程施.doc
目 录
一、编制依据………………………………………………01
二、工程概况………………………………………………01
三、施工准备………………………………………………01
1.技术准备……………………………………………01
2.原材料准备…………………………………………01
3.机械设备准备………………………………………02
4.劳动力准备…………………………………………02
四、分布分项工程操作要点………………………………02
1.汽机基础定位、放线及沉降观测…………………02
2.钢筋工程……………………………………………03
3.架子工程……………………………………………04
4.预埋件、预埋螺栓、预埋套管、预留洞的
安装固定……………………………………………04
5.模板工程……………………………………………06
6.砼工程………………………………………………07
五、质量检验标准…………………………………………10
六、安全组织技术措施……………………………………10
七、质量保证技术措施……………………………………11
八、文明施工及成品保护…………………………………12
附图一 施工网络计划图……………………………14
附图二 沉降观测点平面布置图……………………15
附图三 底板钢筋支撑图……………………………16
附图四 12.60米运转层梁上部双排筋固定支撑图…17
附图五 底板柱插筋加固钢管支撑图………………18
附图六 大块模板拼接及铁件安装图………………19
附图七 预埋件AP -1507~1511安装固定图………20
附图八 预埋套管SL-1500、SL-1511安装固定图…21
附图九 梁柱对拉螺栓加固图………………………22
附图十 基础底板砼浇筑示意图……………………23
附图十一 行走式塔吊平面布置图……………………24
附图十二 2#汽机基础垂直施工缝留设剖面图………25
附图十三 2#汽机基础运转层垂直施工缝留设图……26
附图十四 2#汽机基础6.27m夹层垂直施工缝 留设图………………………………………27
附图十五 基础底板温度监测点平面布置图……………28
附图十六 汽机运转层温度监测点平面布置图…………29
CONTENTS
First, the preparation according to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
Second, project profiles ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
Third, construction preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
1. Technical preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
2. Raw material preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
3. Machinery and equipment ready to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 02
4. The labor to prepare ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 02
Fourth, the distribution sub-project operation points ... ... ... ... ... ... ... ... ... ... ... ... 02
1. Steam turbine foundation for positioning, pay-off and settlement observation ... ... ... ... ... ... ... 02
2. Reinforced engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 03
3. Shelf engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 04
4. Embedded parts, embedded bolts, embedded casing, the hole reserved
Fixed ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 04
5. Template Project ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 06
6. Concrete Engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 07
5, the quality inspection standards ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
6, the Organization for Security Measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
7, quality assurance, technical measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... 11
8, civilized construction and finished to protect ... ... ... ... ... ... ... ... ... ... ... ... ... 12
Photos of a construction network plan ... ... ... ... ... ... ... ... ... ... ... 14
Photo 2 Settlement Observation floor plan ... ... ... ... ... ... ... ... 15
Photo 3 floor bar spanner ... ... ... ... ... ... ... ... ... ... ... 16
Photo 4 12.60 m run double layer of the upper beam fixed support bar chart ... 17
Photo 5 floor support columns Reinforcing Steel Reinforcement Chart ... ... ... ... ... ... 18
Six large photo mosaic and iron template installation diagram ... ... ... ... ... ... 19
Photo 7 embedded parts AP -1507 ~ 1511 fixed map ... ... ... 20
Photo 8 embedded tube SL-1500, SL-1511 fixed plans ... 21
Photo 9 column bolt reinforcement plan ... ... ... ... ... ... ... ... ... 22
Photo 10 of the base diagram Pouring ... ... ... ... ... ... ... ... 23
Photo 11 walking tower crane floor plan ... ... ... ... ... ... ... ... 24
Photo 12 2 # steam turbine foundation construction joints located vertical profiles of ... ... ... 25
Photo 13 2 # operation of steam turbine foundation layer of vertical construction joints located Chart ... ... 26
Photo 14 2 # steam turbine foundation 6.27m vertical construction joints located laminated chart ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 27
Photo 15 of the base temperature monitoring floor plan ... ... ... ... ... 28
Photo 16 turbine operating surface temperature monitoring floor plan ... ... ... ... 29
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 天正电气8.5破解版
- 18395次
- 防雷引下线做法
- 2002次
- 国家标准图集-电气图例(CAD)
- 1320次
- 10kV及以下架空配电线路设计技术规程
- 1080次
- 山西***110kv输电线路施工组织设计(含
- 1074次
- 电气制图和识图知识
- 1020次
- 外电防护方案
- 1007次
- 铜芯电线电缆载流量标准IEC60364-5-523
- 944次
- 电梯安装施工方案
- 812次
- 线路敷设方式代号对照
- 775次