配套管、配线安装
9.1  硬质阻燃塑料管(PVC)明敷设工艺标准
    9.1.1  总则
9.1.1.1  适用范围
    本节适用于公用建筑、工厂、住宅等建筑物的电气配管,可浇筑于混凝土内,也可明装于室内及吊顶等场所;适用于室内或有酸、碱等腐蚀介质的场所照明配管敷设安装(不得在40℃以上的场所和易受机械冲击、摩擦等场所敷设)。
9.1.1.2  编制参考标准及规范
    (1)《民用建筑电气设计规范》(JCJ/T16-92);
    (2)《建筑电气工程施工质量验收规范》(GB50303-2002)。
    9.1.2  施工准备
9.1.2.1  技术准备
    (1) 熟悉图纸资料,弄清设计图的设计内容,注意图纸提出的施工要求。
    (2) 准备施工机具、材料。
    (3) 确定施工方法,编制施工技术措施;为了工程施工,不破坏建筑物的强度和损害建筑物的美观。
    (4) 施工前要认真听取工程技术人员的技术交底,弄清技术
And the pipe, wiring installation
9.1 Rigid plastic pipe flame (PVC) technology standards laid out
    9.1.1 General
9.1.1.1 Scope
    This section applies to public buildings, factories, residential and other buildings electrical piping, can be poured in concrete, it would be next installed on the interior and the ceiling and other places; suitable for indoor or acid, alkali and other corrosive media site lighting with pipe laying installation (not in place for more than 40 ℃ and vulnerable mechanical shock and friction, and the laying place).
9.1.1.2 Reference standards and specifications prepared
    (1) "civil electrical design" (JCJ/T16-92);
    (2) "Building Electrical Engineering Construction Quality Acceptance" (GB50303-2002).
    9.1.2 Construction of preparation
9.1.2.1 Technical Preparation
    (1) be familiar with drawing data, understand the layout of the design elements, drawing attention to proposed construction requirements.
    (2) Prepare construction machinery, materials.
    (3) determine the construction method, preparation of construction technology; for construction, does not undermine the strength and damage buildings beautiful buildings.
    (4) to seriously listen to the pre-construction engineering and technical personnel of the technical disclosure, identify technology
 