聊城发电厂新厂一期工程2×600MW机组共箱绝缘母线安装作.doc
本工程启动/备用变压器和厂用高压变压器与6kV进线开关柜采用共箱绝缘母线连接,其中#1机为731.5米,#2机190.3米。6kV共箱绝缘母线由北京电力设备总厂生产,型号为Ue=6.3kV,Ie=2500A,母线支持槽钢为热镀锌#10槽钢,母线吊装结构及穿墙隔板由厂家成套供应。母线厂根据分段情况设计有母线伸缩节,母线导体间和罩壳间连接采用焊接方式,安装后母线外壳可靠接地,母线和变压器的连接采用软编织铜线,母线与开关柜的连接采用矩形铜母线。
The project start / standby transformer and Plant Inlet 6kV high-voltage transformer and switchgear insulated box with a total bus connections, including # 1 machine is 731.5 m, 190.3 m # 2. 6kV total box insulated bus from Beijing Power Equipment Plant production model Ue = 6.3kV, Ie = 2500A, bus support for the hot dip galvanized channel steel channel # 10, bus loading structure and wall partitions sets supplied by the manufacturer. Bus plant design under the circumstances sub-bus expansion joints, bus conductors and casing connection between the use of welding, reliable grounding installation bus shell, bus and transformer soft woven copper wire connection, bus and switchgear connections with rectangular copper bus bar.
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 天正电气8.5破解版
- 18395次
- 防雷引下线做法
- 2002次
- 国家标准图集-电气图例(CAD)
- 1320次
- 10kV及以下架空配电线路设计技术规程
- 1080次
- 山西***110kv输电线路施工组织设计(含
- 1074次
- 电气制图和识图知识
- 1020次
- 外电防护方案
- 1007次
- 铜芯电线电缆载流量标准IEC60364-5-523
- 944次
- 电梯安装施工方案
- 812次
- 线路敷设方式代号对照
- 775次