污水处理(三期)机电设备单机调试方案.doc
广州市XXX污水处理厂是广州市政府制定的全市污水治理总体规划中的第一座大型城市污水处理厂,位于广州市西郊的XXX上,总占地面积为25公顷。第一期日处理规模15万m3/d于1989年投产,第二期日处理规模15万m3/d于1996年投产,占地面积约14公顷。采用A2/O生物脱氮除磷处理工艺,2000年进行处理能力3万m3/d的挖潜改造工程,总处理规模达到33万m3/d。三期工程是大坦沙污水处理厂一、二期工程的延续和拓展,处理规模是22万m3/d,处理后污水排放标准符合国家和广东省污水排放的一级出水标准,是广州市政府的
XXX sewage treatment plant in Guangzhou City, Guangzhou municipal government of the city's wastewater treatment master plan in the first large-scale municipal wastewater treatment plant, located in the western suburbs of Guangzhou City, XXX, the total area of 25 hectares. The first deal with the scale of maturity 150 000 m3 / d in 1989 and put into operation, the second dealing with the scale of maturity 150 000 m3 / d in 1996 and put into operation, covering an area of about 14 hectares. With A2 / O biological nutrient removal treatment process, capacity of 2000 to 30,000 m3 / d on innovation projects, the total deal size to 330,000 m3 / d. Phase III is Datansha Wastewater Treatment Plant, Phase II continuation and expansion of treatment scale is 220,000 m3 / d, the treated effluent discharge standards in line with national and Guangdong Province, the level of effluent discharge standards, the Guangzhou City Government
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 给水排水构筑物施工及验收规范GBJ141-9
- 1513次
- 给排水管道通水试验记录
- 931次
- 给水排水通用图集(CAD)
- 858次
- 建筑给水排水设计规范GB50015-2003
- 830次
- 共板法兰风管制作安装工艺
- 793次
- 给水排水及采暖工程报验用表列表
- 750次
- 建筑给排水及采暖工程施工质量验收资料
- 575次
- ***室外排水管道施工方案
- 570次
- 水泵扬程估算方法
- 569次
- 给排水工程施工组织设计方案
- 530次