您现在的位置:主页 > 建筑工程 > 安全文明 > >>

建筑施工不扰民施工措施.doc

资料评价:
★★★☆☆
更新时间:
2010-07-10
下载要求:
注册会员
文档大小:
0.01 MB
授权方式:
共享资料
上传会员:
jjk1314
文档类型:
.doc
所属栏目:
安全文明
需要金币:
1
资料语言:
简体中文
资料简介:免费注册 本站会员可得金币,更多赚积分方法请查看:积分说明 下载地址

不扰民施工措施

为保证让施工现场周围的单位、居民有一个良好的工作、学习和生活环境,在施工过程中要严格执行以下不扰民施工措施:
1.晚上十点至早上六点,原则上停止一切建筑施工活动,特别是噪声较大的施工活动,以免影响周围的单位、居民的休息。不可避免要在该时段内施工作业,施工前要先取得周围的单位、居民或居委会的同意,并到政府有关部门办理相应施工许可手续。
2.施工过程中所产生的垃圾、废水、废气等有可能污染周围环境的,应采取相应措施及时处理,不可随意倾倒、排放。
3.施工现场车辆进出场时,要避开每日上、下班(学)时段,不要造成施工现场周围交通不畅或发生事故。
4.施工现场材料的运输车辆要冲洗干净,方可进出现场,运送散装材料的车辆要有防止散落、飘落的措施,防止污染周围地面。运送砂、石的车辆在卸车时,要避开居民休息时段,以免卸料噪音影响他人休息。
5.施工过程中若造成周围环境地面及空气污染,应及时中止施工并采取有力措施及时清理、整改。
6.施工现场周围设置安全警示牌,提醒路人
Construction measures are not disturbing

To ensure that the units around the construction site so that residents have a good work, study and living environment, and in the construction process without causing an inconvenience to strict construction of the following measures:
1. 22:00 to 6:00 am, in principle, to stop all construction activities, particularly noisy construction activities, so as not to affect the surrounding units and residents in the rest. It's inevitable that construction jobs in the period, first to obtain pre-construction units with the consent of residents or neighborhood committees, and to the relevant government departments concerned construction permits.
2. Generated during the construction waste, waste water, gas and other pollution of the environment may be, shall take appropriate measures in time, can not be dumped at random emissions.
3. Played into the construction site vehicle, you should avoid daily commuting (school) hours, not to create bad traffic around the construction site or an accident.
4. Construction site materials transport vehicles to be washed clean before entering and leaving the scene, transporting bulk materials, vehicles have to avoid the scattered, falling of measures to prevent pollution of the surrounding ground. Transporting sand, stone unloading of vehicles, the residents of rest breaks to avoid, so as not to discharge noise of others rest.
5. Construction process, if the environment caused by air pollution in the ground and shall promptly take effective measures to stop construction and timely clean-up and rectification.
6. Set around the construction site safety warning signs to alert passers-by
 

帮助 收藏 报错 评论>>
建筑施工不扰民施工措施下载
点击此处下载