外墙装饰抹灰工程安全作业交底.doc
内容摘要:
1、 新工人进场后应先经过三级安全交底,并经考试合格后方可进入施工现场必须遵守信达建筑工程公司的各项安全规章制度和纪律等。
2、 高空作业时,应检查脚手架是否牢固,特别是大风雨后作业。
3、 对脚手架不牢固之处和跷头板等及时处理,要铺有足够的宽度,以保证手推车运灰浆时的安全。
4、 在架子上工作,工具和材料要放置稳当,不准随便乱扔。
5、 用升降机上料时,要有专人负责开机,遇六级以上大风时应暂停作业。
6、 砂浆机应有专人操作和维修、保养,电器设备应绝缘良好并接地,并做到二级漏电保护。
7、 严格控制脚手架的施工负载。
8、 不准随意拆除、斩断脚手架的软硬拉结,不准随意拆除脚手架上的安全设施,如妨碍施工必须经项目经理批准后,方可拆除妨碍部位。
9、严禁操作人员在酒后进入施工现场作业。
10、班组如果因劳力不足需要再招新工人时,应事先向工地报告。
11、新工人进场后应先经过三级安全交底,并经考试合格后方可让其正式上岗。
12、新工人进场应具有四证,即:职业资质证、身份证、计划生育证和外来人口暂住证。
Abstract:
1, after the admission of new workers should go through three security correspondent, and pass the examination before entering the construction site, construction companies must comply with the letter reached the safety rules and regulations and discipline.
2 high-altitude operations, should check whether the scaffolding firm, in particular wind operating after the rain.
3, on the scaffold is not strong, and toggle between the first board in time, be covered with sufficient width to ensure the safety of mortar transport cart.
4, the shelf work, tools and materials to be placed in safe, not allowed to casually throw.
5, when feeding with a lift, there must be specifically responsible for the boot, the event winds should be suspended for more than six operations.
6, mortar machine shall be hand operation and maintenance, electrical equipment should be well insulated and grounded, and do two leakage protection.
7, strictly control the construction scaffolding load.
8, are not allowed to arbitrarily remove, cut off the hard and soft scaffolding Rachel, are not allowed to arbitrarily dismantle scaffolding safety facilities, such as impeding construction must be approved by the project manager for approval before the removal of prejudice site.
9, is strictly prohibited operators in the drink to the construction site work.
10 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
11, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
12, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160462次
- Autocad2013 64位32位破解版附带注册机
- 148292次
- 天正建筑8.5破解版
- 144039次
- autocad2012 64位32位 破解版(附注册
- 137473次
- 天正建筑8.2破解版
- 123378次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80796次
- 免费农村房屋设计图
- 73688次
- cad图集大全
- 56717次
- 11g101图集全套下载
- 45191次
- 安全生产管理制度(汇集)
- 4282次
- 安全技术操作规程大全
- 1655次
- 施工现场安全生产十大纪律
- 1347次
- 广东省安全管理资料统一用表(附:填写
- 1137次
- 各种机械设备安全操作规程
- 803次
- 现场安全文明施工标准图集WORD格式
- 785次
- 施工企业现场安全全套内业资料
- 627次
- 九牌一图展示
- 592次
- JGJ162-2008建筑施工模板安全技术规范
- 558次
- GB-50348-2004安全防范工程技术规范
- 500次