内容摘要:
1、 进入施工现场必须遵守信达建筑工程有限公司的各项规章制度和纪律。
2、 在室内推小车时,特别是在过道中拐弯时要注意小车把挤手。人推小车不准倒退。
3、 夜间作业要有足够的照明并经二级漏电保护。
4、 灯具应架空并用支架固定,离地面不低于2.4m。不得随便移动临时照明。
5、 使用磨石子机,应戴绝缘手套、脚穿胶鞋。
6、 电源线须经过二级漏电保护并用橡皮电缆线,且不得有接关头现象。
7、 三角磨石必须安装牢固并有防护罩,经试运转正常后方可操作,不得在运转时进行保养。
8、 擦草酸时人人都要佩戴胶皮手套,以免伤手。
9、 磨石机上方不准站人或堆物。
10、井架吊篮提升或下降时,必须关好井架安全门。
11、卸料平台处的操作工人,不得将头、手伸入井架内。
12、卸料平台处的操作工人应待井架停稳后,方可进入吊篮内工作。
13. 严禁操作人员在酒后进入施工现场作业。
14、每个工人进入施工现场都必须头戴安全帽。
15、班组如果因劳力不足需要再招新工人时,应事先向工地报告。
16、新工人进场后应先经过三级安全交底,并经考试合格后方可让其正式上岗。
17、新工人进场应具有四证,即:职业资质证、身份证、计划生育证和外来人口暂住证。
Abstract:
1, into the letter reached the construction site must comply with the rules and regulations Construction Co., and discipline.
2, push a small car in indoor, in particular when turning in the aisle of the crowded car to pay attention to hand. Pushed trolleys are not allowed back.
3, adequate lighting at night operations by the two leakage protection.
4, lamps should be elevated and fixed with a stent, from the ground no less than 2.4m. Shall not be removed without any temporary lighting.
5, using terrazzo machine, should wear gloves, be wearing shoes.
6, the power cord to go through two leakage protection and rubber cables, and may not have access juncture phenomena.
7, triangular terrazzo must be installed securely and with protective cover, the rear by the commissioning normal operational, maintenance when not in operation.
8, wiping the oxalic acid must wear rubber gloves all the time, to avoid hurting the hand.
9, terrazzo machine or the top of the heap objects are not allowed to stand.
10, Derrick raise or lower the basket, you must turn off the derrick safety gate.
11, unloading platform Department's workers, not the head, hands stuck inside the derrick.
12, unloading platform Department's workers should be Derrick a parked, before working into the basket.
13. Non-operators in the drink to the construction site work.
14, each worker entering the construction site must be wearing helmets.
15 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
16, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
17, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160462次
- Autocad2013 64位32位破解版附带注册机
- 148292次
- 天正建筑8.5破解版
- 144039次
- autocad2012 64位32位 破解版(附注册
- 137473次
- 天正建筑8.2破解版
- 123378次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80796次
- 免费农村房屋设计图
- 73688次
- cad图集大全
- 56717次
- 11g101图集全套下载
- 45191次
- 安全生产管理制度(汇集)
- 4282次
- 安全技术操作规程大全
- 1655次
- 施工现场安全生产十大纪律
- 1347次
- 广东省安全管理资料统一用表(附:填写
- 1137次
- 各种机械设备安全操作规程
- 803次
- 现场安全文明施工标准图集WORD格式
- 785次
- 施工企业现场安全全套内业资料
- 627次
- 九牌一图展示
- 592次
- JGJ162-2008建筑施工模板安全技术规范
- 558次
- GB-50348-2004安全防范工程技术规范
- 500次