根据现场场地及施工安排,基坑四周均采用放坡,坡度为1:0.2,边坡采用土钉墙锚喷支护。土方开挖采用机模大开挖,人工配合清除基底预留土层。机械挖土方量170136m3,人工挖土方量1925m3。
3.施工部署
根据隆水观测情况,满足开挖条件后,开始按由西向东的行走方向开挖。采用三台WY160型反铲挖土机,20辆翻斗运土车,一台汽车吊(人工清理基底土层时吊运基坑内土体),具体步骤如上:
4、操作工艺
4.1土方开挖工程
4.1.1先放好坡顶线、坡底线,经复测及验收合格后开妈开挖。
4.1.2机械挖土分三大步进行,第一步挖3.5m,第二步挖4.5m,第三部挖4.8m。预留20cm土层人工清理。(详见基坑开挖剖面图)
4.1.3第一步先挖去面层渣土层至自地坪下2m,自西向东进行,开挖时边坡预留20cm人工清理。再挖基坑中心基土至-3.5m,四周预留8m,做土钉墙锚杆施工的作业面,随挖土随修整喧坡,并进行边坡土钉墙施工(详见降水护坡方案)。待第一步土钉墙混凝土达到充许强度(通常在土钉墙混凝土喷射完成后12h),挖除第一部四周预留的作业面土层,随挖土随修整喧坡,并进行边坡土钉墙混凝土喷 射完居后12h),挖除第一部四周预留的作业面土层,随挖土随修整喧坡,并进行坡土钉墙施工。
4.1.4第一步挖土结束,待土钉墙混凝土达到允许强度后开始第二步
Site and construction of the arrangement according to the site, are used around the foundation Slope, gradient 1:0.2 slope using soil nailing anchor support. Large scale earth excavation by machine excavation, soil and artificial clear basal reserved. Mechanical excavators side volume 170136m3, the amount of artificial earth digging 1925m3.
3. Construction of the deployment
Long observation under conditions of water to meet the excavation conditions, started walking from west to east direction of excavation. With three WY160-type backhoe, 20 dump trucks of earth, a mobile crane (to clean up the basement foundation soil within the soil when lifting), the specific steps as above:
4, the operation process
4.1 Earthwork Excavation
4.1.1 first put away crest line, slope the bottom line, and the acceptance by the retest after the mother open excavation.
4.1.2 Mechanical excavators were three big first step in digging 3.5m, the second step dug 4.5m, third dig 4.8m. 20cm of soil set aside to clean up. (See profile excavation)
4.1.3 The first step surface muck dredged from the floor level under 2m, from west to east to, excavation slope reserved 20cm to clean up. Foundation Center-based soil and then dug to-3.5m, earmarked around 8m, so soil nail wall surface anchor construction operations, finishing with a noise slope with an excavator, and the slope of soil nail wall construction (see precipitation Slope Programme ). Soil nail wall to be the first step to achieve full promise strength concrete (usually in the soil nail wall after concrete jet 12h), excavation around the first layer of work space set aside, with the dressing with a noise slope excavation, and the slope Soil Nail Wall concrete jet End home after 12h), reserved for excavation work around the first surface layer, finishing with an excavator with a noise slope, and soil nailing for slope construction.
4.1.4 The first step in digging the end, when soil nail wall to allow the strength of concrete after the second step
 