十一、暖卫工程施工方案.doc
1、暖卫工程概况
暖卫工程包括给水系统、排水系统、消防系统、雨水系统、空调冷却水系统。
1.1 给水系统
水源为室外给水管网接出—根DN 150引入管,接人大楼地下—层。根据水压,给水竖向分高低两个区,高区为四至十六层,由屋顶水箱供给;低区为地下二层至地上三层,该区利用场区给水管直接供水。
1.2 排水系统
室内排水系统为污水、废水合流系统,地上部分直接排出室外;首层单独排出室外;地下部分分区设置集水坑汇集地下室污、废水,然后用潜水泵提升排出室外,潜水泵由集水坑水位自动控制;粪便污水经室外化粪池处理后,排人市政管道。
1.3 消防系统
1.3.1 本楼消防系统由消火栓系统、自动喷水灭火系统及气体灭火系统组成。
1.3.2 消火栓系统水源为地下一层的消防水池,其贮水量432m3。平时由屋顶水箱供水,屋顶水箱贮存消防水量18m3。系统上、下成环,除水箱间、变配电间外,其它各层均设有消火栓保护。室外设有三套消防水泵接合器,供消防车向系统供水。
1.3.3 自动喷水灭火系统水源为地下一层的消防水池,自动喷洒用
1 warming Health Project Overview
Warm Health Project, including water supply systems, drainage systems, fire systems, water systems, air conditioning cooling water system.
1.1 Water Supply System
Water for outdoor access a water supply network - the introduction of the root DN 150 pipes, building underground access - level. Under water pressure, water level of the two vertical sub-area, high area for the 4-16 level, from the roof tank supply; low area for the basement level to the ground three, the district used the site area to direct water supply pipes.
1.2 Drainage System
Interior drainage system for the sewage, waste water confluence system, shoot directly into the open air; the first floor alone exhausted to the outside; underground basement area set sump sewage collection, wastewater, and then discharged with a submersible pump to enhance outdoor, submersible pump water from the sump automatic control; fecal sewage treated by septic tanks outside, drained municipal pipes.
1.3 Fire Protection System
1.3.1 The floor system consists of fire hydrant system, automatic fire sprinkler system and gas system components.
1.3.2 Hydrant system for the underground water level of the fire pond, the water storage 432m3. Usually from the roof tank water supply, fire water storage tank roof of 18m3. System, the next into the ring, in addition to the water tank, the variable power distribution room, the other floors are equipped with fire hydrant protection. With three sets of outdoor fire pump adapter for the fire water supply to the system.
1.3.3 fire sprinkler system for the underground water level of the fire pool, automatic sprinkler use
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次