1临时用电工程
1.1 一 般 规 定
1.1.1 电工作业必须经专业安全技术培训,考试合格,持《北京市特种作业操作证》(外埠来京从事电工作业的人员,必须持原所在地地(市)级以上劳动保护安全监察机关核发的特种作业证明,并申请换领《北京市特种作业临时操作证》)方准上岗独立操作。非电工严禁进行
CONTENTS
(1) Temporary power project
(2) Scaffolding works
(3) Foundation Support
(4) template works
(5) Crane lifting operations
(6) tower crane
(7) material hoist
(8) other vertical transportation equipment
(9) Winter Construction Safety Measures
A temporary power project
1.1 General requirements
1.1.1 Electrical work must be approved by the professional security training, examination, and hold "Permit for special operations in Beijing" (other ports to Beijing to engage in electrical work of the staff, must hold the original location (city) level and above the protection of labor safety supervision authorities issued that special operations, and application for renewal of "temporary operating permit special operation in Beijing"), are allowed to operate independently posts. Non-electrical strictly prohibited