您现在的位置:主页 > 建筑工程 > 施工方案 > >>

复合型保温彩钢板安装方案.doc

资料评价:
★★★☆☆
更新时间:
2010-07-05
下载要求:
注册会员
文档大小:
0.01 MB
授权方式:
共享资料
上传会员:
lajks
文档类型:
.doc
所属栏目:
施工方案
需要金币:
1
资料语言:
简体中文
公告:免费注册 会员可立即获得金币,更多赚取金币方法请查看:金币说明 下载地址
资料简介:

(1)
加工压制金属板原材料应有生产厂商的质量证明书,对原材料的品质按有关规定做抽样检查,其结果应符合国家现行标准的规定或定货合同的要求。
压型金属板和泛水板、包角板成型后,其基板不得有裂纹。
加工时要避免出现漆模裂纹剥落和露出金属基板等缺陷。
(2)
压型金属板后按合同文件的要求包装出厂,包装必须可靠,避免损伤压型金属板。
每个包装箱均应设置标签,标明压型金属板的材质、板型、板厚、板长、板号、数量、和生产日期。
(3)
装卸无外包装的压型金属板时,应采用吊具起吊,严禁直接使用钢丝绳起吊。
压型金属板的长途运输应采用集装箱装载。
用车辆运输无外包装的压型金属板时,应在车上设置衬有橡木胶垫的枕木,其间距不宜大于3000MM。
9.2.3.3现场制作、场内运输与安装
原材料进入现场后,根据货物清单认真检查,如发现任何质量缺陷或数量的短缺,应以书面形式通知制造商。
现场加工与车间预制具有相同的操作工艺和质量要求。
金属板及泛水板、包角板为了避免板面的任何损伤,应做到以下几点:

属板必须对方紧固以免相互滑移对板面涂层的破坏。

开金属板必须用尼龙绳和专用提开工具。

板长超过6M时,每隔3M应设一道尼龙绳。

每米尼龙绳应设比板略宽的垫块做支撑。

提开金属板时每货盘金属板的数量不宜超过12张。
在安装中,始终是粉笔线作出铅孔及打自攻钉或拉铆钉的位置,这可以保证板
(1)
Metal raw materials processing to suppress should have a certificate of quality manufacturers of quality raw materials to do spot checks according to relevant regulations, and the results should be consistent with current national regulations or orders the contract requirements.
Pressed metal panels and flashing plate, wrap angle plate after molding, the substrate may not have crack.
Processing mode when the crack to avoid paint peeling off and exposing the defects such as metal substrates.
(2)
Pressed metal plates in accordance with the contract documents upon the request of packaging factory, packaging must be reliable and to avoid injury-pressure metal plates.
Each box should be set to label pressure metal plate material, plate type, thickness, plate length, plate number, quantity, and production date.
(3)
Working without the pressure of outer metal plates should be used lifting sling, wire rope lifting direct use is strictly prohibited.
Pressed metal plates of long-distance transport should be containerized.
Transport vehicle without the pressure of outer metal plates should be set up in the car is lined with oak pad of the sleepers, the distance should be less than 3000MM.
9.2.3.3-site production, transportation and installation of floor
Raw materials into the scene, according to carefully check the list of goods, such as found in any number of quality defects or shortage should be notified in writing the manufacturer.
On-site pre-processing and plant operations with the same technology and quality requirements.
Metal plate and pan water board, including board angle board to avoid any injury, should do the following:

Is a board fastened to each other so as to avoid another slip on the plate surface coating damage.

Open metal plate must be special mention of nylon rope and open tools.

When long boards more than 6M, 3M shall have one every nylon rope.

Each Mini Long rope should be set slightly wider than the board's pads to do support.

Open metal plate provided for each pallet number plate not more than 12.
In the installation, always make a chalk line to play lead hole and tapping screw or pop rivets position, which can ensure the board
 

帮助中心 收藏 >>>
复合型保温彩钢板安装方案下载
点击此处下载