HZS35B×2搅拌站安装与施工方案
一、 概述
鉴于大学城指挥部指定供应我标段的长兴混凝土搅拌站所供应的混凝土量明显不能满足现时的需求量,为缓解大学城建设混凝土需求高峰期的供应强度、保证工程的进度和工期,落实《穗学指办字[2003]130号》文件的精神,我司拟在施工区域内建立混凝土现场搅拌站。此搅拌站主要供应药科楼、工科楼的混凝土需求量和作为其他栋号的应急后备,每小时产量为40m3。
二、 搅拌站的平面布置
本搅拌站拟建在在建教学区内,位于药科楼、工科楼和教学区A线道路之间(位置详见总平面图)。搅拌站内的机械、设备、材料堆场的具体位置和车进出方向等详见(平面布置图)。所需的水池、添加剂池和排水沟的位置和做法详见平面布置图中注释。搅拌机位置搭设简易上盖。
三、 人员及机械配置
1、 人员配置
本搅拌站按其运作要求配置:主管1人;机长1人;操作人员4人;铲车司机2人;质量管理员2人,共10人。
2、 机械配置
本搅拌站主要的机械设备配置如下:抽水泵机2台(配时间继电器);配料机2台(配计量控制系统);搅拌主机2台(型号:
HZS35B × 2 mixing plant installation and construction plan
I. Introduction
In view of University City headquarters designated supply me tender by Changxing Concrete supplied the concrete mixing station obviously can not meet existing demand, to alleviate the construction of University City, the supply of concrete strength of the peak demand, ensure the progress and schedule to implement " Studies that do ear [2003] No. 130, "document the spirit of our company to be established within the construction area on-site mixing of concrete. This mixing of the major suppliers Pharmaceutical floor, engineering floor, concrete demand and other buildings as emergency back-up number, output per hour 40m3.
Second, mixing station layout
The mixing station to be built in the area of teaching in the building, located Pharmaceutical floor, engineering floor, and teaching area A line of road between (see the overall plan here). Mixing the machinery, equipment, materials storage yard location and vehicle access to the specific direction see (floor plan). The required pool, pool and drain additive location and floor plans of the practice see the Notes. Location erection simple mixer cover.
Third, personnel and mechanical configuration
1, staffing
The mixing station configuration according to their operational requirements: 1 person in charge; captain 1; operators 4; forklift driver 2; Quality Manager 2, a total of 10 people.
2, machine configuration
The main mechanical mixing device configuration is as follows: 2 sets of pumps machine (with relay); dosing machine 2 (with metering control systems); Mixer 2 sets (Model:
 