SBS沥青卷材屋面防水工程施工作业指导书.doc
目 录
1、施工准备……………………………………………………………1
2、施工工艺流程和顺序………………………………………………3
3、施工方法……………………………………………………………3
4、细部处理……………………………………………………………4
5、蓄水试验……………………………………………………………8
6、技术参数……………………………………………………………8
7、质量标准……………………………………………………………8
8、质量控制措施………………………………………………………9
9、质量通病防治措施…………………………………………………9
10、产品保护措施……………………………………………………10
11、安全注意事项……………………………………………………10
1、施工准备
1.1防水材料选用和准备
1.1.1一般选用高强度、低延伸的防水卷材,应结合工程的实际情况,选用3㎜厚的Ⅱ类拉力≥400N、延伸率≥5%的黄麻胎体SBS改性沥青防水卷材。
节点附加层应选用氯丁橡胶改性沥青防水涂料,要求固体含量≥43%,延伸≥4.5㎜,耐热度为80℃时5h无流淌、起泡。
密封材料选用SBS改性沥弹性密封膏,粘结性≥15㎜,耐热度下垂≤4㎜。
1.1.2防水材料的质量要求
所用的SBS卷材改性沥青防水卷材、氯丁橡胶改性沥青防水涂料、SBS改性沥青弹性密封膏等均必须有出厂合格
CONTENTS
1, construction preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 1
2, the construction process and sequence ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 3
3, method ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 3
4, detail treatment ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 4
5, water test ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8
6, Technical parameters ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8
7, the quality standard ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 8
8, quality control measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 9
9, quality defects prevention measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 9
10, product protection measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
11 Safety Precautions ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
1, construction preparation
1.1 Selection and preparation of waterproof materials
1.1.1 General use of high strength, low extension of the waterproofing membrane, the project should be combined with the actual situation, using 3 mm thick, Class Ⅱ pull ≥ 400N, elongation ≥ 5% of the jute matrix SBS modified bitumen membrane.
Node should use an additional layer of neoprene modified asphalt waterproofing coating, required solid content ≥ 43%, extension of ≥ 4.5 mm, heat degree is 80 ℃, 5h free flowing, bubbling.
SBS modified asphalt sealing material used flexible sealant, bonding of ≥ 15 mm, ≤ 4 mm ptosis degree heat.
1.1.2 Water quality requirements of materials
Membrane used in SBS modified bitumen membrane, chloroprene rubber modified asphalt waterproofing coating, SBS modified bitumen flexible sealant Dengjun must have factory qualified
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次