XX市XX大道人行道工程施工方案.doc
一 施 工 方 案
1、工程概况
本工程为XX市XX大道人行道工程。工程建设地点位于XX经济技术开发区南部,西起XX路,东止XX高速公路连接线,本工程设计起点--终点为:K0+000—K1+810.18南侧,全长1510.18M(不含王家河大桥300M桥面),该人行道宽6M。
本人行道路工程主要工序为:人工土方;路床平整碾压;机械外运土方;C15砼垫层;广场砖铺装;花岗石铺装;雨花石铺装。
2、施工部署及管理目标
1.1、施工部署
我公司自成立以来,承建了一大批大中型道路工程,创出了一批精品名牌。我们在总结以往道路工程经验的基础上,认真分析了本工程特点,精心组织,精心施工,将该工程列为我公司2002年重点管理工作,组建强有力的项目部负责施工。本着“建设放心工程、追求更高目标”的宗旨,按照国家、部委有关规范、规程的要求,建立健全的与之相应的质量保证体系与质量管理体系。按照质量保证手册与质量管理手册编制本工程项目质量计划,并严格执行。我们的目标是确保本工程的质量达到市优质工程的标准。并设立专职计划调度员,定期检查网络计划实施情况,随时调解生产中的
A work plan was implemented
1, Project Overview
This works for the XX City, XX Avenue sidewalk project. Construction of economic and technological development zone located south of XX, XX Road, west, east XX expressway connecting line, the starting point of this design - the end is: K0 +000- K1 +810.18 south, full 1510.18M (excluding Royal River Bridge deck 300M), the sidewalk width 6M.
I line the main road works in process are: artificial earth; Road bed flat rolling; mechanical Sinotrans earth; C15 concrete cushion; square brick pavement; granite pavement; stone pavement.
2, construction deployment and management objectives
1.1, construction deployment
Company since its inception, the construction of a large number of medium-sized road projects, create a number of top brands. We sum up the past experience of road works, based on careful analysis of the characteristics of this project, careful organization and construction, the project as I focus on the management of the company in 2002, formed a strong project department responsible for construction. The spirit of "construction safety project, the pursuit of higher goals," the purpose, according to the state, ministries and relevant specifications and requirements, the establishment of a sound corresponding quality assurance system and quality management system. According to the quality assurance manual and quality management manual preparation of the project quality plan, and strictly enforced. Our goal is to ensure the quality of the projects to market high-quality engineering standards. And the establishment of full-time planning and scheduling staff, regularly check the network planned implementation of the mediation at any time production
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次