一、施工方案
1-1工程概况、条件及特点
1工程概况
本工程是XX县二水厂净水厂合同编号为XX标段。水厂新建在XXX,厂区东西长162m,南北宽110m,占地面积26亩。厂区内自然地面标高在41.50¬-51.98之间,高差9.48m。根据现场勘察构筑物依地势呈阶梯布置,厂区地面控制标高为黄海高程48.0m最低处为41.3;从XX县自来水公司原新墙河泵房,增设一条D
CONTENTS
A construction program
Second, the construction schedule and the assurance measures
III layout
Fourth, measures to ensure quality
Fifth, to ensure safety
6, civilized construction site measures
7, labor arrangement scheme
8, the main material, component usage plan
9, the main equipment used arrangements
10, rationalization proposals
A construction program
1-1 Project Overview, conditions and characteristics
1 Project Overview
This project is the second XX County Water treatment plant contract number for the XX tenders. Waterworks in XXX, plant east to west, 162m, north to south 110m, covers an area of 26 acres. Plant the natural ground elevation between the 41.50 ¬ -51.98, elevation 9.48m. According to on-site inspection of structures according to the terrain ladder arrangement, plant elevation of the ground control lowest point for the Yellow Sea Elevation 48.0m 41.3; from XX County, the new wall of the original river water companies pumping station, an additional D
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次