XX医院大楼工程施工方案.doc
一、施工方案
1-1工程概况、条件及特点
1-1- 1工程概况
XX工程,建设地点位于X,整个建筑呈一个“X”字形,主楼共X层,第X层屋顶为水箱间、设备用房及电梯机房等,建筑占地面积3100m2,建筑面积为19200 m2,总床位数为500床。建筑高度23.90 m,框架抗震等级为三级,抗震设防烈度为七度,耐火等级为一级,屋面防水等级为一级,工程设计年限为50年。在一层门厅南向入口设有一个“八”字弧形斜坡道,建筑物内设有三台电梯,均为客梯兼消防电梯,同时考虑残疾人使用需要。
本工程各层建筑功能分别为:
一层:病房、卫生间、出院结算中心、入院登记中心、急诊室、治疗室、医生办公室等,层高3.60m;
二至六层:病房、卫生间、医生办公室、治疗室等,层高均为3.30m;
屋顶层:屋顶为水箱间、设备用房及电梯机房等,层高3.30m。
防水工程:本工程防水等级为Ⅰ级,屋面防水采用屋面钢筋混凝土刚性自防水和卷材防水相结合,防水层采用三元乙丙橡胶防水卷材(有保温隔热层),面贴陶瓷地砖。
大楼外装饰主要为:外墙漆。
内装饰主要为:楼地面:水泥砂浆找平地面;内墙柱:混合砂浆外刮白色904仿瓷涂料三遍;顶棚:混合砂浆外刮白色904仿瓷涂料三遍。
本工程采用钢筋混凝土框架结构体系,独立柱基础和部分人工挖孔桩基础;管道井、电梯井、楼梯间采用240mm厚MU10粘土砖M5混合砂浆砌筑;±0.000以下采用240mm厚MU10粘土砖M5水泥砂浆砌筑;内隔墙采用140mm厚MU7.5混凝土空心砌块M7.5混合砂浆砌筑。
本工程钢筋采用Ⅰ--Ⅱ级钢筋,钢筋接头优先采用焊接,焊接时优先采用闪光对焊,二级钢筋焊接采用E43焊条;
结构构件主筋保护层厚度如下表所示:(单
A construction program
1-1 Project Overview, conditions and characteristics
1-1 - 1 Project Overview
XX engineering, construction, located at X, the building was an "X" shape, the main building of X layer, the first X layer roof water tanks, the equipment room and elevator machine room, etc., construction area of 3100m2, construction area of 19200 m2, The total number of beds to 500. Building height of 23.90 m, the framework of seismic rating of 3, the seismic intensity is 7 degrees, fire resistance rating for a roofing grade level, the project design life of 50 years. To the south entrance hall on the first floor has an "eight" the word curved ramps, the building is equipped with three elevators, lifts are elevators and fire, taking into account the needs of people with disabilities.
Architectural features of the project levels, respectively:
Floor: room, bathroom, hospital billing center, the admission centers, emergency rooms, treatment rooms, doctors offices, floors 3.60m;
Two to six: wards, toilets, medical offices, therapy rooms, floors are 3.30m;
Roof level: roofs, water tanks, the equipment room and elevator machine room, etc. storey 3.30m.
Waterproof: Waterproof rating of the project grade Ⅰ, reinforced concrete roofing used roofing and waterproofing membrane waterproofing of rigid combination of waterproof layer of EPDM waterproofing membranes (with thermal insulation layer), ceramic floor tiles Sticking .
Main outside the building decoration: outside wall paint.
Mainly in decoration: the ground floor: cement floor leveling; Interior Column: 904 mixed mortar outside the white melamine paint scratch three times; roof: mixed mortar outside scraping white melamine paint three times 904.
The project reinforced concrete frame structure, the foundation and part of pole man Drilled Pile Foundation; tube wells, elevator shafts, stairwells with 240mm thick MU10 brick masonry mortar mix M5; ± 0.000 below with 240mm thick clay brick M5 MU10 cement mortar lining; within the wall with 140mm thick hollow concrete block M7.5 MU7.5 masonry mortar mix.
The project reinforced by Ⅰ - Ⅱ grade steel, welded steel joints given priority, the priority use of flash butt welding, two steel welding electrode with E43;
The thickness of the reinforcement, protection of structural members as shown below: (Single
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次