奥帆基地工程PVC卷材施工方案.doc

资料评价:
★★★☆☆
更新时间:
2010-07-05
下载要求:
注册会员
文档大小:
0.84 MB
授权方式:
共享资料
上传会员:
lajks
文档类型:
.doc
所属栏目:
施工方案
需要金币:
1
资料语言:
简体中文
公告:免费注册 会员可立即获得金币,更多赚取金币方法请查看:金币说明 下载地址
资料简介:

目    录

1. 工程概况……………………………………………………………………2
2. 方案选择……………………………………………………………………2
3. 材料及机具…………………………………………………………………2
4. 施工准备……………………………………………………………………2
4.1 PVC卷材的生产及运输
4.2 PVC卷材的存放
4.3 材料复试
4.4 基层要求
4.5 样板领路制
5. 施工工艺……………………………………………………………………3
5.1工艺流程
5.2施工方法
6. 质量保证措施………………………………………………………………5
7. 工程验收……………………………………………………………………6
8. 安全措施……………………………………………………………………6
9. 编制依据……………………………………………………………………6
10.附图…………………………………………………………………………7

 

 


1.工程概况
本工程分为奥运村地下工程,设二层地下室,地下室建筑面积为30375m2,基础埋深约10米。本工程位置临海,所处水位较高且水量较大。工程采用混凝土自防水和外卷材防水两道设防,其中外防水采用外防外贴聚氯乙烯PVC高分子复合卷材(晨成牌)作为防水材料,防水范围为底板、顶板、侧墙全部砼结构,总防水面积约为40000m2。
卷材防水工程工期及进度安排同《施工组织设计大纲》。该工程工期紧,防水施工面节点及错台多,施工复杂,项目部必须精细施工
CONTENTS

1. Project Overview ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
2. Selection ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
3. Materials and equipment ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
4. Construction preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
4.1 PVC sheet production and transport
4.2 PVC membranes deposited
4.3 Materials retest
4.4 Primary requirements
4.5 System model lead the way
5. Construction technology ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 3
5.1 Process
5.2 Construction Methods
6. Quality assurance measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 5
7. Project Acceptance ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 6
8. Safety measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 6
9. Preparation according to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 6
10. Photo ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 7

 

 


1. Project Overview
The project is divided into the Olympic Village underground project, located two-story basement, basement floor area of 30375m2, based on depth of about 10 meters. Waterfront location of this project, in which water level was high and larger. Works with concrete and the outer membrane of waterproof waterproof two defenses, which outer waterproof PVC laminates with external anti-PVC polymer composite membrane (morning into the card) as a waterproof material, waterproof range of floor, roof, wall, all concrete structure, with a total water area of about 40000m2.
Waterproofing membrane duration and the schedule with the "construction organization design framework." The project construction period, construction of surface water and the wrong node sets and more complex construction, the project must be precise construction of the Department of
 