大亚湾核电基地新建南区篮球场工程重力式毛石挡土墙砌筑.doc
大亚湾核电基地新建南区篮球场工程位于南生活区原消防训练站,工程场地将占用南面部分山林坡地,场地的平整需朝南面的土坡进行开挖。根据设计图纸的场地面积要求,按设计建筑场地面积平整场地,需往南面土坡开挖4.1m左右。且经开挖后,南面将形成一面1~4米高差的裸露土坡(如下图示),长达66米;东面也将形成一段长约30米,高差约2.5米的坡堑。考虑东面、南面边坡的长期稳定,将在东、南两面边坡上各加砌一排毛石重力式挡土墙护坡。东面挡土墙的高度约2.5m,长约30m;南面挡土墙高度走势沿原土坡走势,即高度在1~4米之间,长达66m(如下图示)。现场土质为砂石混合土,根据土质对南面土坡取1:0.35坡度进行放坡,南面土坡需开挖
约705方(包括挡土墙基槽),需回填土方约330;东面地堑回填面积为135,回
Daya Bay Nuclear Power Base New South basketball court project in the Southern District of the original live fire training station, construction site will occupy the southern part of the mountain slope, site preparation required to carry out excavation south side of the slope. According to design drawings of the site area requirements, according to design construction site area leveling the ground and had to go around the south slope excavation of 4.1m. And by excavating the south side of the form 1 to 4 meters poor bare soil (as shown below), up to 66 meters; the east will also form a 30 m long, 2.5 meters in height difference of slope cutting . Consider the east, south slope of the long-term stability, will be in the east, south slope on both sides of a row of the puzzle added rubble retaining wall revetment. The height of the east wall about 2.5m, length 30m; south slope retaining a high degree of movement along the original trend, or a high degree of between 1 to 4 meters, up to 66m (as shown below). On-site soil is sand and gravel mixed soil, soil under the soil on the south slope to take 1:0.35 Slope, south slope excavation required
About 705 parties (including the retaining wall foundation trench), need to backfill earth about 330; eastern graben filling area 135, back
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次