钢筋加工制作技术方案
一、 施工依据
1. 设计图纸及会审纪要。
2. 《建筑工程施工工艺标准》有关内容。
3. 混凝土结构工程施工及验收规范GB50204-92。
二、 施工准备
1. 熟悉图纸,加强自审,发现有问题及时向有关部门反映,以便尽快解决促进施工正常进行。
2. 及时按要求作出施工配料单。配料单要求断料前2天报到专业技术人员。审核后方可开始断料。
3. 钢筋进场后按施工总平面布置图,及专业工长要求的位置分类码放整齐,入场前要作好场地清理,垫好木方。
4. 入场的钢筋按试验员要求及时取样交试验员送试验室作复试,复试合格后方可加工制作。
5. 各类钢筋加工机具进场后立即安排人员检查、就位、试运转,同设备组办好交接手续。机具出了问题及时
Steel manufacture technology program
A construction based on
1. Mixed design drawings and summary.
2. "Building Construction Technology Standards" relevant content.
3. Concrete construction and acceptance of GB50204-92.
Second, construction preparation
1. Familiar with the drawings, to enhance self-examination, found the problem in a timely manner to the relevant department in order to facilitate construction as soon as possible to solve the normal.
2. Timely construction of required ingredients to make one. Single-ingredient required to report two days before the breaking of professional and technical personnel. Examination before they can start off material.
3. After entering the construction reinforced by the general layout plans, and professional requirements of the position of foreman classification of laying is neat, clean-up before admission to the venues, good wooden pad.
4. Bar admission requirements in a timely manner in accordance with test sample delivery member of staff sent to laboratory for test retest, retest pass behind the production can be processed.
Five. Various types of steel processing equipment immediately after admission arrangements for staff inspection, in place, commissioning, transfer procedures with the equipment group. Equipment out of the question in a timely manner
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次