目 录
1.编制依据: 3
1.1施工图纸: 3
1.2主要规范、标准、规程: 3
1.3标准图集: 3
1.4外妇手术楼施工组织设计: 4
2.工程概况: 4
3.设计、规范要求: 4
4.施工部署及任务安排: 5
4.1任务安排: 5
4.2流水段划分: 5
4.3施工总部署: 5
4.4劳动力安排: 5
5.施工准备: 5
5.1材料准备: 5
5.2机具准备: 6
5.3技术准备: 6
5.4作业条件: 7
6.施工工艺流程: 7
6.1底板钢筋绑扎工艺流程: 7
6.2剪力墙钢筋绑扎工艺流程: 7
6.3顶板钢筋绑扎工艺流程: 8
7.施工方法和技术要求: 8
7.1钢筋加工: 8
7.2钢筋连接: 10
7.3底板钢筋绑扎: 14
7.4墙体钢筋绑扎: 16
7.5顶板钢筋绑扎: 19
8.质量标准及质量保证措施: 19
8.1底板钢筋绑扎质量标准: 19
8.2剪力墙钢筋绑扎质量标准: 20
8.3顶板钢筋绑扎质量标准: 20
9.成品保护措施: 21
10.安全生产与文明施工: 21
附图一:基础结构施工流水段划分图
附图二:标准层施工段划分图
CONTENTS
1. Prepared according to: 3
1.1 Construction Drawings: 3
1.2 The main norms, standards, regulations: 3
1.3 Standard Atlas: 3
Outside the women's surgical floor, 1.4 Construction design: 4
2. Project Overview: 4
3. Design specifications: 4
4. Arrangements for the deployment and construction tasks: 5
4.1 task arrangement: 5
4.2 The water segment is divided into: 5
4.3 Construction General Deployment: 5
4.4 labor arrangements: 5
5. Construction preparation: 5
5.1 Material preparation: 5
5.2 equipment ready: 6
5.3 Technical Preparation: 6
5.4 Operating conditions: 7
6. Construction process: 7
6.1 floor reinforced banding process: 7
6.2 Shear Walls banding process: 7
6.3 The roof steel banding process: 8
7. Construction methods and technical requirements: 8
7.1 steel processing: 8
7.2 Reinforcement Connection: 10
7.3 Floor Reinforced Binding: 14
7.4 Wall Reinforced Binding: 16
7.5 Roof steel banding: 19
8. Quality standards and quality assurance measures: 19
8.1 floor reinforced banding quality standards: 19
8.2 Shear Walls banding quality standards: 20
8.3 The roof of reinforced banding quality standards: 20
9. Product protection measures: 21
10. Construction Safety and Civilization: 21
Photo 1: Construction of water infrastructure division map in paragraph
Photo 2: Typical floor plan construction segment is divided