第一节 施工现场基本要求
一.基本要求
1.现场要有明显的防火宣传标志,每月对职工进行一次防火教育,定期组织防火检查,建立防火工作档案。
2.电工,焊工从事电气设备安装电、气焊作业,要有操作证和用火证。动火前要清除附近易燃物,配备看火人员和灭火用具。用火证当日有效。动火地点变换,要重新办理用火手续。
3.使用电气设备和易燃、易爆物品,必须严格防火措施,指定防火负责人,配备灭火器材,确保施工安全。
4.因施工需要搭设临时建筑,应符合防盗、防火要求,不得使用易燃材料。城区内的工地一般不准支搭木板房。必须支搭时,须经消防监督机关批准。
5.施工材料的堆放、保管,应符合防火安全要求,库房应用非燃材料搭设。易燃、易爆物品,应专库储存,分类单独
Fire Engineering
Basic requirements of Section I construction site
1. Basic requirements
1. On-site fire prevention should be obvious signs of the staff to conduct a monthly fire safety education, with periodic fire prevention inspections, the establishment of fire prevention files.
2. Electricians, welders and in electrical equipment, installation of electric, gas welding operation, there must be operating permit and permit the use of fire. Removed before hot work near flammable objects, equipped with fire personnel and fire-fighting equipment to see. Fire certificate valid on the day. Hot work location change, we must re-apply for the use of fire procedures.
3. Use of electrical equipment and flammable, explosive materials, fire prevention measures must be strictly designated fire head equipped with fire fighting equipment, to ensure construction safety.
4. Erection of temporary buildings for construction needs, should meet the security, fire protection requirements, shall not use combustible materials. The site is generally not allowed within the city take the panel houses with poor support. Take the time to be supported, subject to fire inspection authority.
5. Construction materials piled up, custody, shall comply with fire safety requirements of the application of non-combustible material warehouse erection. Flammable, explosive materials, shall be devoted to library storage, classification alone
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次