斜屋面项目专项施工方案.doc
斜屋面项目专项施工方案
一、总 则:为了提高工程质量,保障“屋面工程的使用功能性良好”的原则,依照国家现行施工质量验收规范的标准和asdf企业标准,进行斜屋面的施工;每道施工工序,严格的在监理人员的监督下进行,并对每道工序进行检查验收、评审,作出检验记录,报监理人员签证备案。本工程10号、12号楼仍各按原施工分段分为两个作业段进行施工。二、斜屋面施工领导小组:组 长: 副组长:成 员: 三、施工准备: 1. 人员准备:抽调技术水平较高的技术工人进行操作;其中:测量工 人、木工 人、钢筋工 人、混凝土工 人、防水工人、装饰工 人、普工 人; 2. 材料准备:按施工要求及施工顺序和用料计划,及时按施工材料管理制度进料,现场材料可满足需要;所有主材必须有出厂合格证,钢材、水泥、砂石料、防水材料等必须经宜昌市建筑工程质量检测站检验合格,屋面瓦必须经
Inclined roof project specific construction plan
1, General Provisions: In order to improve the quality of the project to ensure "the use of functional roof works well" principle, in accordance with current national construction quality acceptance standards and asdf enterprise standards for the construction of inclined roof; Every construction process, strictly in under the supervision of supervising staff, and each process check and acceptance, review and make inspection records, reported that supervisors visa record. This works 10, 12, is still the original building construction sub-divided into two sections to the construction work. 2, inclined roof construction leading group: Leader: Deputy leader: Members: 3, construction of preparation: 1. Personnel preparation: technical level transferred to operate high-skilled workers; including: measuring worker, carpenter were, reinforced the workers, concrete workers, water workers, decorative workers, general workers; 2. Material preparation: According to the requirements of construction and construction materials in order and plan in a timely manner by construction of the feed material management system, on-site materials to meet needs; all the main material must have a certificate factory, steel, cement, sand and gravel material, waterproof material must be construction quality inspection station in Yichang City, passing inspection, the roof tiles must be
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次