雨期施工方案.doc
雨期施工方案
1.编制依据
《北京××工程施工图纸》
《北京××工程施工组织设计》
《施工现场文明达标管理规定》
2.工程概况
本工程建筑面积××m2,地上××层,地下2层,局部××层。建筑檐高××m,为全现浇剪墙结构。除楼梯间内隔墙厚180mm外,其余内外墙均为200mm厚。今年雨季施工的项目为主体及二次结构工程。
3.雨期施工准备工作
3.1组织准备
项目部位立雨季施工领导小组,组成如下:
组工:×××
副组长:××× ×××
成 员:××× ××× ××× ××× ××× ×××
3.2技术准备
雨季到来之前,组织有关人员按照方案要求进行技术交底,提出雨施计划,为施工提供技术准备。
Rain of construction project
1. Preparation of the basis
"Beijing × × design drawings"
"Beijing × × construction organization design"
"Construction site compliance regulations of civilization"
2. Project Profiles
The project construction area × × m2, on the ground × × floors 2 underground levels, local × × layer. Building eaves high × × m, for the whole place shear wall structure. In addition to the stairway wall thickness of 180mm, the other interior and exterior walls are 200mm thick. Construction of the project during the rainy season this year as the main and secondary structural engineering.
3. Rain preparation of construction
3.1 Organization of preparation
Construction of the project site during the rainy season established the leading group, composed as follows:
Group work: × × ×
Deputy Leader: × × × × × ×
Members: × × × × × × × × × × × × × × × × × ×
3.2 Technical Preparation
Before the rainy season, were organized to carry out technical disclosure in accordance with program requirements, make rain facilities plan to provide technical preparations for the construction.
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次