棚户区改造二期(东洲)龙凤矿前工程临时用电施工方案.r.doc
棚户区改造二期(东洲)龙凤矿前工程第九标段,位于茨沟南面。本标段共八栋楼,砖混结构,六层,总高17.5米。根据实际情况共设2台变压器。其中1#变压器250KVA给9#、10#、11#、12#楼供电;2#变压器315KVA给9#、10#、11#、12#楼供电。本标段共设4台一级配电箱,7台二级配电箱,40台开关箱,即可满足施工要求。供电系统采用三相五线制既TN-S系统。采取三级配电二级保护。
三、 项目部根据工程需要配备用电设备如下:
Shantytowns 2 (East Island) Dragon Mining Works for the ninth sections, located cigou south. The tenders eight building, in brick structure, six stories, total height 17.5 meters. A total of 2, according to the actual situation of transformers. Of which 1 to 9 # transformer 250KVA #, 10 #, 11 #, 12 # Building power supply; 2 # to 9 # transformer 315KVA, 10 #, 11 #, 12 # Building Supply. The tenders total of 4 sets of a distribution box, 7 sets of two power distribution box, switch box 40 can meet the construction requirements. Three-phase power supply system using both the five-wire TN-S system. 2 to 3 power distribution protection.
Third, the project with the Department of electrical equipment according to project needs the following:
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次