青岛帆船中心陆域工程Ⅱ标段模板工程施工方案(地下).doc
目 次
1. 工程概况……………………………………………………………………………………2
1.1 建筑及结构特点
1.2 方案选择
2. 施工程序……………………………………………………………………………………2
2.1 施工顺序
2.2 施工工艺流程
3. 施工方法……………………………………………………………………………………3
3.1 底板垫层模板支设
3.2 外墙第一道施工缝以下模板支设
3.3 底板上反梁模板支设
3.4 柱模板支设支设
3.5 剪力墙模板支设
3.6 楼板、梁模板支设
3.7 电梯井壁模板支设
3.8 楼梯模板支设
3.9 后浇带模板支设
3.10有防水要求的墙柱对拉螺栓特殊说明
3.11 模板拆除
4. 主要资源需求………………………………………………………………………………11
4.1 劳动力需求计划
4.2 主要周转材料需求计划
5. 施工要求及保证措施………………………………………………………………………12
5.1 施工要求
5.2 施工控制要点及技术措施
5.3 组织及管理措施
5.4 安全技术措施
6. 编制依据……………………………………………………………………………………15
附:模板计算书
CONTENTS
1. Project Overview ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
1.1 Building and structural characteristics
1.2 Selection
2. The construction procedure ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 2
2.1 Construction Sequence
2.2 Construction Process
3. Construction methods ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 3
3.1 Template support floor cushion set
3.2 The external walls of the first set construction joints support the following template
3.3 floor on the anti-Beam design template support
3.4 column template set support based Support
Shear wall design template support 3.5
3.6 slabs, beams set the template support
3.7 elevator shaft design template support
3.8 stairs design template support
3.9 branch back strip template set
3.10 waterproof requirements Qiang Zhu and bolt the special instructions
3.11 template removal
4. The main resource requirements ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 11
4.1 The demand for labor programs
4.2 The main working material requirements planning
5. The construction requirements and ensure that measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 12
5.1 Construction requirements
5.2 Construction of control points and the technical measures
5.3 Organization and management
5.4 Safety Measures
6. Preparation according to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 15
Appendix: Template calculations
2009-10/青岛帆船中心陆域工程Ⅱ标段模板工程施工方案(地下).rar
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次