青岛供电公司厂房及经济适用房人防地下室工程施工方案.r.doc
一、工程概况
1、工程特点和施工条件:
青岛市供电公司厂房及经济适用房工程位于青岛市市南区延吉路155号。结构形式为框支剪力墙,总建筑面积23449平方米(其中地上部分18259平方米,地下部分5190平方米)。地下二层人防部分平时为车库,抗力等级为六级。
本工程战时划分为一个防护单元,划分为A、B两个抗暴单元,防护等级为六级。防火等级为一级防火,地下室平时功能部分设火灾自动报警系统和自动灭火系统,消防控制室设在地下层。地下室所设停车库划分为一个防火分区,设备用房自成一个防
First, project survey
1, project features and construction conditions:
Qingdao Power Company plant and affordable housing project is located in Yanji Road, Qingdao, 155. Structure for the frame-supported shear wall, with a total construction area of 23,449 square meters (of which 18,259 square meters above ground, underground part of the 5190 square meters). Air defense part of the usual two-story underground garage, resistance rating of 6.
The project is divided into a protection unit during the war, divided into A, B two uprising unit, protection class is 6. Fire rating of a fire, usually features some of the basement set up automatic fire alarm system and automatic fire extinguishing systems, fire control room located in the basement. Established in the basement parking garage into a fire district, self-contained space defense equipment