您现在的位置:主页 > 建筑工程 > 施工方案 > >>

双排脚手架计算书.doc

资料评价:
★★★☆☆
更新时间:
2010-07-05
下载要求:
注册会员
文档大小:
0.01 MB
授权方式:
共享资料
上传会员:
lajks
文档类型:
.doc
所属栏目:
施工方案
需要金币:
1
资料语言:
简体中文
公告:免费注册 会员可立即获得金币,更多赚取金币方法请查看:金币说明 下载地址
资料简介:

脚手架计算书

1、计算依据
(1)《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2001)
(2)《建筑结构荷载规范》(GB50009-2001)
(3)工程设计图纸及地质资料等
2、脚手架的计算参数
搭设高度H=39.6米(取最大高度,22排),步距h=1.8米,立杆纵距la=1.5米,立杆横距lb=1.1米,连墙件为2步3跨设置,脚手板为毛竹片,按同时铺设7排计算,同时作业层
Scaffolding calculations

1, calculated on the basis
(1) "construction steel tubular scaffold safety technical specifications" (JGJ130-2001)
(2) "Structural Load Standard" (GB50009-2001)
(3) engineering design drawings and geological data
2, the calculation of parameters of scaffolding
Erection height H = 39.6 m (maximum height taken, 22 rows), step away from h = 1.8 m vertical pole from the la = 1.5 m, horizontal pole from lb = 1.1 m, with wall pieces for the 2-step 3, cross-setting Scaffold board for the bamboo pieces, calculated according to the same time laying seven rows, while operating level

帮助中心 收藏 >>>
双排脚手架计算书下载
点击此处下载