化学植筋施工方案.doc
化学植筋施工方案房屋建筑
植筋施工工艺:
定位 →钻孔 → 清孔 → 钢材除锈 → 锚固胶配制 → 植筋 → 固化、保护 → 检验
1.定位
1.1.按设计要求标示植筋钻孔位置、型号,若基材上存在受力钢筋,钻孔位置可适当调整,但均宜植在箍筋内侧(对梁、柱)或分布筋内侧(对板、剪力墙)。
2.钻孔
2.1.钻孔宜用电锤或风钻成孔,如遇钢
Program of housing construction in the construction of chemical anchorage
Anchorage construction technology:
Location → drilling → Chiang Khong steel rust → → → anchorage anchorage → curing adhesive preparation, protection → test
1. Positioning
1.1. According to the design marked anchorage hole location, type, if the existence of the reinforced substrate position of the hole can be adjusted, but all to plant in the stirrup inside (on the beams and columns) or the distribution of the medial tendon (on the plate, shear wall).
2. Drilling
2.1. Drilling hammer or pneumatic drill hole is preferred in case of steel
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次