季节性施工措施
1、雨季施工的措施:
⑴施工前对整个工程的排水系统进行统一规划和安排,确保施工期间与完工后的排水畅通,进行桩基施工前,沿建筑物四周设置纵向边沟,尽量将临时排水系统与永久性设施相结合。
⑵在人工桩基础施工
Seasonal construction measures
1, the rainy season the construction of measures:
⑴ the entire project before construction of the drainage system of unified planning and arrangements to ensure that during construction and after completion of the drainage flow, to conduct pre-construction pile, set vertically along the ditch around the building, as far as possible facilities for the temporary drainage system and the permanent phase combination.
⑵ pile foundation construction in artificial