一、工程概况
本工程为唐山市宏扬花园商住楼工程,位于唐山市火炬路西侧,由唐山宏扬房地产开发公司招标筹建,唐山国旺建筑安装有限公司中标承建。工期为333天,要求2001年10月10日开工,2002年10月30日竣工交付使用。该工程由唐山市规划建筑设计研究院设计,建筑平面为5单元组合条式住宅楼。建筑面积为16757.66M2(其中地下室面积2310M2)。地下是一层半地下室,地上主体为六层。地下室层高2.2M,首层层高为3.6M,二层层高为3.0M,三至六层层高为2.9M,单元组合为一梯两户,一二层为商业用房,三至六层为住宅。该工程为框架结构。该工程设置四台间距为48m两端距建筑物两端24m,塔吊安装方案编制依据QTG250型塔式起重机说明书P7-P12《塔式起重机安全规程》GB5144-94,《塔式起重机操作使用规程》JBJ80012-89,《建筑施工安全检查标准》(JGJ59-99)、《河北省〈建筑施
First, project survey
To carry forward this project in Tangshan City Garden composite construction, is located in Tangshan City, torch Road west, real estate development company from the Tangshan Hong Yang, tender preparation, construction and installation, Ltd. Tangshan Guo wang bid construction. Duration of 333 days, requested October 10, 2001 started on Oct. 30, 2002 completion of delivery. The project by the Tangshan City Planning and Design Institute of Design, Architecture flat strip combination for the 5 unit residential building. Construction area 16757.66M2 (including basement area of 2310M2). Ground is a layer of semi-basement, main floor for the six. Basement storey 2.2M, first floor storey to 3.6M, two-story story is 3.0M, three to six layers high as 2.9M, unit mix is a ladder two and one two-story commercial buildings, three to six-storey residential. The project for the frame structure. The project set four distance 48m away from the buildings at both ends of both ends of 24m, tower crane installation programming QTG250 tower crane according to the instructions P7-P12 "Tower Crane Safety Regulations" GB5144-94, "tower crane operator to use a point of order" JBJ80012-89, "construction safety inspection standards" (JGJ59-99), "Hebei Province," Building and facilities
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次