塔吊安装方案示例2.doc
邯鄣市电业局2#高层住宅楼
QT80A塔式起重机安装方案
施工单位:中煤建安第六十九处
一、 塔机方案编制依据
电业局项目部塔机方案编制主要是根具以下几点:
1. 电业局2号层住宅施工组织设计
2. 施工图纸及现场地质情况
3. QT80A塔式起重要说明书P31 46。
二、 工程概况及现场情况
邯鄣供电公司高层点式2号住宅楼,位丛台东路供局新厂区家属院内。地
Han Zhang Municipal Electric Power Bureau 2 # high-rise residential buildings
QT80A Tower Crane Installation
Construction Unit: Coal Jian 第六 19
First, programming based on tower crane
Ministry of Electric Power Industry Bureau projects the main programming tower is the root with the following:
1. Electric Power Industry Bureau on the 2nd floor of residential construction organization design
2. Construction drawings and site geological conditions
3. QT80A tower an important statement P31 46.
Second, project profiles and site conditions
Han Zhang power company executives point-2 residential buildings, located Congtai East for the Council within the new factory Shizhi Relative'S Courtyard. Land
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 全套教学楼毕业设计
- 2515次
- 5号、4A号砖砌化粪池施工方案
- 2122次
- 施工围墙施工方案
- 1698次
- 后浇带施工方案
- 1486次
- 悬挑式脚手架施工方案
- 1412次
- 冬季施工应急预案
- 1215次
- 大型机械土石方平整工程施工方案
- 1204次
- 现场安全文明施工方案
- 1150次
- 悬挑卸料平台搭设方案及计算
- 1138次
- 楼梯踏步护角做法(CAD)
- 1111次