一;工程概况
1.2.2 地理位置和现场情况
工程位于上海闵行区莘庄工业区华宁路以西、横沙河以北地块,基地东侧为华宁路,南侧为正在施工的规划主路一,预计年底建成。基地北面为 NEC厂房。现场地势平坦。自然地面平均标高约为4.50m。
目前出入厂区有两条道路。一条是沿华宁路(双向四车道)、联农路(6米水泥路)进入厂区东南角。另一条是沿华宁路、上广电NEC南侧围墙市政路进入厂区东北角并与厂区北侧道路衔接,目前正在进行市政道路施工,预计在8月底可以具备通车条件,现阶段进出施工现场的道路为联农路/华宁路,在临时用电方面,已有两路临时供电线路接到施工现场,施工和生活用水有两路,一路由厂区北侧上广电NEC接入,管径为Ø50mm,另一路由东南侧民房接入,管径为40mm, 目前本工程三通一平已经完成,已具备开工条件。
1.2.3 工程施工单位概况
本工程共有4个单体组成,分别为:1工区、2工区、3工区。三个灌注桩基础施工组,一个桥梁施工组。
二;临时排水方案
2.1防止水污染措施
1; Project Overview
1.2.2 Location and site conditions
Project is located in Minhang District, Shanghai Xin Zhuang Industrial Zone, west of Hua Ning, Wang Sha block north of the base east of the Hua Ning Road, south of the planning for the construction of the main road is one end of the year is expected to be completed. NEC plant north base. The scene is flat. The average natural ground level is about 4.50m.
Currently there are two roads out of the factory. Hua Ning Road along a (two-way four lanes), United Agricultural Road (6 meters concrete road) into the southeast corner of the factory. The other is along the Chinese Ning, SVA NEC Municipal Road south wall into the factory and the northeast corner of the north side of the road link with the plant, municipal road construction now under way, expected to open to traffic by the end of August to have the condition, at this stage and out of construction site road for the United Agricultural Road / Hua Ning Road, in the temporary power consumption, has received a two-way temporary power line construction site, construction and household use, two way, all the way from the factory north of SVA NEC access, diameter To Ø50mm, another access route southeast of houses, diameter of 40mm, the current leveling of the project has been completed and the conditions already have started.
1.2.3 Overview of Construction
This works in the four monomers, namely: a work area, work area 2, 3 work area. 3 Pile Foundation Construction Group, a group of bridge construction.
2; temporary drainage scheme
2.1 Measures to prevent water pollution
 