交底内容:
A、施工准备:
2.1  材料要求:
2.1.1  涂料:乙酸乙烯乳胶漆。应有产品合格证、出厂日期及使用说明。
2.1.2  填充料:大白粉、石膏粉、滑石粉、羧甲基纤维素、聚醋酸乙烯乳液、地板黄、红土子、黑烟子、立德粉等。 
2.1.3  颜料:各色有机或无机颜料,应耐碱、耐光。
      2.2  主要机具:
      2.2.l  一般应备有高凳、脚手板、半载大桶、小油桶、铜丝箩、橡皮刮板、钢片刮板、腻子托板、小铁锹、开刀、腻子槽、砂纸、笤帚、刷子、排笔、擦布、棉丝等。
      2.3   作业条件:
      2.3.1  墙面应基本干燥,基层含水率不得大于10%。
      2.3.2  抹灰作业已全部完成,过墙管道、洞口、阴阳角等应提前处理完毕,为确保墙面干燥,各种穿墙孔洞都应提前抹灰补齐。
      2.3.3  门窗玻璃要提前安装完毕。
      2.3.4  地面已施工完(塑料地面、地毯等除外),管道设备安装完,试水试压已进行完。
      2.3.5  大面积施工前应事先做好样板间,经有关质量部门检查鉴定合格后,方可组织班组进行大面积施工。
      2.3.6  冬期施工室内涂料工程,应在采暖条件下进行,室温保持均衡,一般室内温度不直低于+10℃,相对湿度为 60%,不得突然变化。同时应设专人负责测试和开关门窗,以利通风排除湿气。
B、操作工艺:
3.1  工艺流程
Cards on the table contents:
A, construction preparation:
2.1 Material Requirements:
2.1.1 Coatings: vinyl acetate emulsion paint. Should product certification, manufacture date and instructions.
2.1.2 filler: The white powder, gypsum powder, talcum powder, carboxymethyl cellulose, polyvinyl acetate emulsion, floor yellow, red son, smoke son, lithopone so.
2.1.3 pigments: organic or inorganic colored pigments, should be alkali-resistant, light-fastness.
      2.2 Main equipment:
      2.2.l should normally have high stool, scaffold board and half a bucket, a small oil drums, wire baskets, rubber scraper, steel scraper, putty pallets, small shovel, knife, putty groove, sand paper, broom , brush, brush, rags, cotton, silk and so on.
      2.3 Operating conditions:
      2.3.1 The wall should be the basic dry, grass-roots level not more than 10% moisture content.
      2.3.2 plaster work has been completed, over the wall pipe, hole, horn, etc. Yin and Yang should be disposed of in advance, to ensure that the wall dry, all kinds of holes through the wall should be padded before plastering.
      2.3.3 To advance the glass doors and windows installed.
      2.3.4 Construction of the ground has been completed (plastic surface, except carpet, etc.), plumbing installed, test the water pressure test carried out completed.
      2.3.5 Construction of large area well in advance before the model, the quality of departments by the accredited inspection only after the construction of a large area organized team.
      2.3.6 Construction of indoor winter paint project should be carried out under heating conditions, at room temperature to maintain a balanced, general indoor temperature does not always lower than +10 ℃, relative humidity 60%, no sudden changes. At the same time should be set specifically responsible for testing and switch windows to facilitate ventilation and exclude moisture.
B, operating processes:
3.1 Process:
 