室内装饰抹灰工程安全作业交底.rar
内容摘要:
1、 进入施工现场必须遵守南靖信达建筑工程有限公司的各项安全生产规章制度和纪律。
2、 室内抹灰使用的木凳、金属支架应搭设平稳牢固,脚手板高度不大于2m,架子上堆放材料不得过于集中,存放砂浆的灰斗、灰桶要放稳。
3、 搭设脚手架不得有跷头板,并严禁脚手板支搁在门窗、上下水的管道上。
4、 操作前应检查架子、高凳等是否牢固,如发现不安全地方立即作加固等处理,不准用50×100mm、40×60mm的楞木(2m以上跨度)、钢模板等作为立人板。
5、 搅拌砂浆与抹灰作业时,尤其在抹顶棚时,应注意灰浆溅入眼内。
6、 在室内推运输小车时,特别是在过道中拐弯时要注意小车挤手。在推小车时不准倒退。
7、 严禁从窗口向下随意抛掷东西。
8、 井架吊篮起吊或放下时,必须关好井架安全门,头、手不得伸入井架内,待吊篮停稳,方可进入吊篮内工作。
9、严禁操作人员在酒后进入施工现场作业。
10、每个工人进入施工现场都必须头戴安全帽。
11、班组如果因劳力不足需要再招新工人时,应事先向工地报告。
12、新工人进场后应先经过三级安全交底,并经考试合格后方可让其正式上岗。
13、新工人进场应具有四证,即:职业资质证、身份证、计划生育证和外来人口暂住证。
Abstract:
1, into the construction site must comply with Construction Co., Ltd. Nanjing Cinda all safety regulations and discipline.
2, interior plaster used wooden bench, erection of stable metal stent should be firm, Scaffold board height of not more than 2m, shelf stacking material may not be too concentrated, stored mortar ash bucket, ash bucket to put stability.
3, erection of scaffolding may not have toggle head board, and support non-Scaffold board put in windows and doors, up and down the water pipe.
4, the shelf should be checked before operation, whether the high stool so strong, such as unsafe places such as immediate treatment for reinforcement are not allowed to use the 50 × 100mm, 40 × 60mm in leng wood (2m above span), such as steel formwork Liren board.
5, mixing mortar and plastering operations, especially in the wiping ceiling, splashing into eyes should be noted that within the mortar.
6, in the room pushing the transport of small cars, particularly when turning in the aisle in the car should pay attention to squeeze hands. In the small car are not allowed to push back.
7, is prohibited from the free throw things down the window.
8, Derrick basket lifting or down, you must turn off the derrick safety gate, head, hands shall not extend into derrick, pending the basket a parked to enter the basket to work.
9, is strictly prohibited operators in the drink to the construction site work.
10, each worker entering the construction site must be wearing helmets.
11 team if the need to move because of a labor shortage of new workers, the report shall be submitted to the site.
12, after the admission of new workers should go through three security correspondent, and pass the examination before they can let the official posts.
13, the new approach should have four cards of workers, namely: professional qualification certificate, identity cards, birth certificates and residence permits.
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 屋面防水技术交底
- 1604次
- 建筑工程施工技术交底典型实录
- 1338次
- 工程施工安全技术交底资料库
- 761次
- 室内顶棚墙面粉刷技术交底
- 622次
- 室内消防管道及设备安装工艺技术交底
- 612次
- 挤密桩施工安全技术交底
- 596次
- 砖砌体工程技术交底
- 580次
- 室外面砖工程技术交底 外墙砖
- 571次
- 室内涂料及腻子施工技术交底
- 550次
- 火灾自动报警系统安装工艺技术交底记录
- 505次