现浇水磨石地面施工技术交底.xls.xls
一、施工准备
(一)作业条件
1、顶棚、墙面抹灰已完成,并已验收,屋面已做完防水层。墙面已弹好+50mm标高水平线。
2、安装好门框并加防护,与地面有关的水、电管线已安装就位,穿过地面的管洞已堵严、堵实。
3、做完地面垫层,按标高留出磨石层厚度(至少3mm)。
4、石粒应分别过筛,并洗净无杂物。
(二)材质要求
First, construction preparation
(A) Operating conditions
1, ceiling and wall plaster have been completed and acceptance, roof waterproofing has been done. Wall has a good +50 mm shells elevation level.
2, installed door frame and add protection, and ground the water and electricity lines have been installed in place, through the surface of the tube holes are blocked Yan, blocking real.
3, finished floor cushion, leaving a millstone by elevation of the thickness (at least 3mm).
4, stone tablets should be separately sieved and washed debris-free.
(B) material requirements
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 屋面防水技术交底
- 1604次
- 建筑工程施工技术交底典型实录
- 1338次
- 工程施工安全技术交底资料库
- 761次
- 室内顶棚墙面粉刷技术交底
- 622次
- 室内消防管道及设备安装工艺技术交底
- 612次
- 挤密桩施工安全技术交底
- 596次
- 砖砌体工程技术交底
- 580次
- 室外面砖工程技术交底 外墙砖
- 571次
- 室内涂料及腻子施工技术交底
- 550次
- 火灾自动报警系统安装工艺技术交底记录
- 505次