02轻型井点降水工程.doc

更新时间: 2024-02-23
下载权限: 免费会员
文件大小: 0.01 MB
文件类型: .doc
浏览次数:
上传会员: 382957161
所属栏目: 技术交底
进入下载页
资料简介

一、 施工准备
(一) 施工机具
1、 管:φ38~55,壁厚为3.0mm的无缝钢管或镀锌管,长2.0m左右,一端用厚为4.0mm的钢板焊死,在此端1.4m长范围内,在管壁上钻φ15mm的小圆孔,孔距为25mm,外包两层滤网,滤网采用编织布,外部再包一层网眼较大的尼龙丝网,每隔50~60mm用10号铅丝绑扎一道,滤管另一端与井点管进行连接。
2、 井点管:φ38~55,壁厚为3.0mm的无缝钢管或镀锌管。
3、 连接管:透明管或胶皮管,与井点管和总管连接,采用8号铅丝绑扎,应扎紧以防漏气。
4、 总管:φ75~102钢管,壁厚为4.0mm,用法兰盘加橡胶垫圈连接,防止漏气、漏水。
5、 抽水设备:根据设计配备离心泵、真空泵或射流泵,以及机组配件和水箱。
6、 移动机具:自制移动式井架(采用旧设备振冲机架)、牵引力为6t的绞车。
7、 凿孔冲击管:φ219×8的钢管,其长度为10m。
8、 水枪:φ50×5无缝钢管,下端焊接一个φ16的枪头喷嘴,上端弯成大约直角,且伸出冲击管外,与高压胶管连接。
9、 蛇形高压胶管:压力应达到1.50MPa以上。
10、 高压水泵:100TSW-7高压离心泵,配备一个压力表,作下井管之用。
(二) 材料
粗砂与豆石,不得采用中砂,严禁使用细砂,以防堵塞滤管网眼。
First, construction preparation
(A) construction equipment
1, pipe: φ38 ~ 55, the seamless steel pipe wall thickness of 3.0mm or galvanized pipe, about 2.0m long, one end with a thick steel plate welded to 4.0mm, 1.4m long on this side, within the wall small hole drilled φ15mm, pitch is 25mm, outsourcing two filters, filters using fabric, a layer of external re-package larger nylon mesh screen, every 50 ~ 60mm wire banding together with 10, the other side of the filter tubes connect with the well point.
2, well point tube: φ38 ~ 55, the seamless steel pipe wall thickness of 3.0mm or galvanized pipe.
3, connecting tubes: transparent tubes or hoses, and the well point and mains connection, using 8 wire banding shall be fastened to prevent leakage.
4, Explorer: φ75 ~ 102 pipe, wall thickness of 4.0mm, with additional rubber gasket flange connections to prevent air leakage, water leakage.
5, pumping equipment: According to the design with pump, vacuum pump or jet pump, as well as accessories and tank units.
6, moving machinery: self-made mobile rigs (using old equipment rack of vibration), traction winch for the 6t.
7, perforated shock tube: φ219 × 8 of the pipe, its length is 10m.
8, water gun: φ50 × 5 seamless steel tubes, welded a bottom nozzle φ16 of its action, the top bent approximately at right angles, and extend the impact of controls, and high pressure hose connection.
9, snake-like high pressure hose: the pressure should reach more than 1.50MPa.
10, high pressure pumps: 100TSW-7 high-pressure pump, equipped with a pressure gauge for use in well control.
(B) material
Sand and stone beans, not used in the sand, do not use sand to avoid blocking filter control mesh.
 

下载地址

前往下载