06筏型基础工程.doc
一、 施工准备
(一) 钢筋工程
1、 作业条件
(1) 钢筋绑扎前,核对钢筋加工料表是否正确,并检查有无锈蚀现象,除锈后再运至施工部位。
(2) 做好放线工作J单出柱、墙的位置线,并弹好钢筋位置线。
2、 材料要求
(1) 钢筋:级别、规格符合设计要求。质量符合现行标准要求。
(2) 20~22#火烧丝、水泥砂浆(塑料)垫块等。
3、 机具准备
(1) 钢筋切断机、钢筋弯曲机、钢筋调直机、钢筋钩子、钢筋扳子、钢丝刷、断火烧丝铡刀等。
(2) 墨斗、墨汁、小白线、粉笔等。
(二) 模板工程
1、 作业条件
(1) 外墙高出300mm部分模板采用竹胶板拼
First, construction preparation
(A) of the steel works
1, operating conditions
(1) steel banding before the check sheet steel processing material is correct and check for corrosion phenomenon, rust and then transported to the construction site.
(2) well-off single from column J of work, the location of the wall line and reinforced elastic good line of position.
2, material requirements
(1) steel: grade, specifications meet the design requirements. Quality meets current standards.
(2) 20 22 # fire wire, cement mortar (plastic) pads and so on.
3, equipment preparation
(1) steel cutting machine, steel bending machine, bar straightening machine, steel hook, steel wrench, wire brush, broken fire wire hay cutter and so on.
(2) ink fountain, ink, white line, chalk, etc..
(B) of the formwork
1, operating conditions
(1) part of the external walls 300mm above the template using bamboo fight
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 屋面防水技术交底
- 1604次
- 建筑工程施工技术交底典型实录
- 1338次
- 工程施工安全技术交底资料库
- 761次
- 室内顶棚墙面粉刷技术交底
- 622次
- 室内消防管道及设备安装工艺技术交底
- 612次
- 挤密桩施工安全技术交底
- 596次
- 砖砌体工程技术交底
- 580次
- 室外面砖工程技术交底 外墙砖
- 571次
- 室内涂料及腻子施工技术交底
- 550次
- 火灾自动报警系统安装工艺技术交底记录
- 505次