拆除工程安全技术交底
1. 作业前,必须将要拆除的建筑物的电线、上下水管道、煤气管道、电话线等先切断或迁移。
2. 有高血压、贫血、恐高症等疾病的人严禁作业。
3. 作业前必须先戴安全帽、防护眼镜,系安全带,穿工作鞋,站在稳固的结构部位上操作。
4. 要有牢固的围护措施,封闭要严密,不能有孔洞,防止砖、石等飞溅到地面伤人。
5. 拆除时应自上而下进行,禁止数层楼同时拆除。当拆除某一部位时,应防止其他部位发生坍塌。作业下方设警戒,并挂标识牌。
6. 不行在高压线、裸线边干活,且要有隔离措施。
要检查铁锤等是否安全牢固,有松动的不能使
Removal Safety Technology Details
1. Operation prior to the removal of the buildings to be wires, up and down the water pipelines, gas pipelines, telephone lines, and the first cut or relocated.
2. Have high blood pressure, anemia, fear of heights and Huntington's diseases were non-operational.
3. Work needed to be wearing helmets, safety glasses, seat belt, working boots, standing on the structure of a solid part of the operation.
4. To have a solid enclosure measures, closed to tight, can not have holes to prevent the brick and stone flying to the ground assault.
5. Removal should be from top to bottom, the number of floors at the same time prohibiting removal. When the removal of a site should be to prevent the occurrence of other parts of the collapse. Operating below the set warning and hanging signage.
6. No in the high voltage, bare edge work, and quarantine measures should be.
To check whether the security firm hammers, etc., are not so loose
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 屋面防水技术交底
- 1604次
- 建筑工程施工技术交底典型实录
- 1338次
- 工程施工安全技术交底资料库
- 761次
- 室内顶棚墙面粉刷技术交底
- 622次
- 室内消防管道及设备安装工艺技术交底
- 612次
- 挤密桩施工安全技术交底
- 596次
- 砖砌体工程技术交底
- 580次
- 室外面砖工程技术交底 外墙砖
- 571次
- 室内涂料及腻子施工技术交底
- 550次
- 火灾自动报警系统安装工艺技术交底记录
- 505次