脚手架拆除安全技术交底.doc
脚手架拆除安全技术交底
⒈拆除脚手架前,班组成员要明确分工,统一指挥,操作过程中精力要集中,不得东张西望和开玩笑,工具不用时要放入工具袋内。
⒉正确穿戴好个人防护用品,脚应穿软底鞋。拆除挑架等危险部位要挂安全带。
⒊拆除脚手架前,周围应设围栏或警戒标志,在交通要道设专人监护,禁人入内。
⒋严格遵守拆除顺序,由上而下,一步一清,不准上下层同时作业。
⒌拆除脚手架的大横杆、剪刀撑,应先拆中间扣,再拆两头扣,由中间操作人往下顺杆子,不得往下乱扔。
⒍拆除的脚手架杆、脚手板、钢管、扣件等材料应往入传递或用绳索吊下,不得往下投扔,以免伤人和不必要的损失。
⒎拆除过程中最好不要中途换人,如必须换人时,应将拆除情况交代清楚。
⒏拆除过程中最好不要中断,如确需中断应将拆除部分处理清楚告一段落,并检查是否会倒塌,确认安全后方可停歇。
⒐脚手架拆除完后应将架料分类堆放,堆放地点要平坦,下设支垫排水良好。钢类最好放置室内,堆放在室外应
Scaffolding Safety Technology Details removal
⒈ dismantle scaffolding before, team members must have a clear division of labor, unity of command and effort should be concentrated during the operation, not looking around and joke, tools, tool bag when not in place.
⒉ Wear proper personal protective equipment, foot wear soft shoes. Removal of aircraft and other dangerous parts of pick belts to hang.
⒊ dismantle scaffolding before, around the fence or warning signs should be located in the travel corridors hand care, ban people from entering.
⒋ strictly abide by the removal order, from top to bottom, step one clear, closed upper and lower simultaneous operation.
⒌ dismantling scaffolding large bar, scissors, should split the middle button, and then split two buttons, the operator down along the middle pole, not down to throw.
⒍ removal of scaffolding poles, scaffold boards, pipes, fasteners and other materials should be delivered or used rope to hang into the next, can not throw down the investment to avoid injury and unnecessary losses.
⒎ removal process is best not to halfway substitutions, such as the need to replace him, should remove the situation clearly.
⒏ removal process is best not to interrupt, if it proves necessary removal of part of the treatment interruption should clearly come to an end, and check whether it will collapse, that it is safe before they can stop.
⒐ After removal of scaffolding material should be classified stacking frame, stacking location to be smooth, support cushion consists of good drainage. Steel class best place indoors, outdoors should be stacked
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154873次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139022次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90906次
- CAD2008注册机及使用说明
- 84341次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 屋面防水技术交底
- 1604次
- 建筑工程施工技术交底典型实录
- 1338次
- 工程施工安全技术交底资料库
- 761次
- 室内顶棚墙面粉刷技术交底
- 622次
- 室内消防管道及设备安装工艺技术交底
- 612次
- 挤密桩施工安全技术交底
- 596次
- 砖砌体工程技术交底
- 580次
- 室外面砖工程技术交底 外墙砖
- 571次
- 室内涂料及腻子施工技术交底
- 550次
- 火灾自动报警系统安装工艺技术交底记录
- 505次