门窗工程技术交底.doc
进入下载页
内容:
一、交底依据
1、设计图纸、图纸会审纪要及现行GB50210-2001规范、铁路医院变更。
二、技术标准:
1、门窗工程验收时应检查下列文件和记录
1)门窗工程的施工图、设计说明及其他设计文件。
2)材料的产品合格证书、性能检测报告、进场验收记录和复验报告。
3)特种门及其附件的生产许可文件。
4)隐蔽工程验收记录。
5)施工记录。
2、门窗工程应对下列材料及性能指标进行复验。
1)人造木板的甲醇含量。
2)建筑外墙金属窗,塑料窗的抗风压性能、空气渗透性能和雨水渗透性能。
3、门窗工程应对下列隐蔽工程项目进行验收
1)预埋件和锚固件。
Content:
1, cards on the table based on
1, design drawings, drawings reviewing the minutes and the current GB50210-2001 standard, the railway hospital changes.
Second, technical standards:
1, doors and windows should check the following project acceptance documents and records
1) The windows and doors project construction drawings, design specifications and other design documents.
2) The certificate of material products, performance test reports, site acceptance test records and reports re.
3) Special doors and accessories manufacturing license file.
4) The record of covert project acceptance.
5) construction records.
2, doors and windows should the following materials engineering and performance indicators for retesting.
1) The methanol content of artificial wood.
2) The exterior walls of metal windows, plastic windows performance of wind pressure, air permeability and water permeability.
3, doors and windows works projects should be acceptance of the following hidden
1) embedded parts, and anchors.