检验批验收中应提交的附件资料文件.rar
1、复合地基
(1)、灰土地基检验批验收应提供的附件资料
1)、原材料质量合格证(白灰或水泥);
2)、水泥试验报告;
3)、进场材料验收记录;
4)、施工记录(搅拌、铺设厚度、上下层搭接、加水量、压实遍数、压实系数、承载力等);
5)、干密度试验报告(见证取样);
6)、隐蔽工程验收记录(每层铺设并夯击完成,进行下一层铺设时);
7)、承载力测试报告;
8)、自检、互检及工序交接检查记录;
9)、其它应报或设计要求报送的资料。
注:合理缺项除外。
(2)、砂和砂石地基检验批验收应提供的附件资料
1)、原材料质量合格证(砂、石);
2)、砂、石试验报告;
1, composite foundation
(1), lime soil or ground inspection lot acceptance of the attached information should be provided
1), certificate of quality raw materials (mortar or cement);
2), cement test reports;
3), admission materials, acceptance records;
4), construction records (mixing, laying the thickness of the lower lap, the amount of water, compaction times the number of compaction factor, capacity, etc.);
5), dry density test report (witness sample);
6), hidden project acceptance record (completed on each floor laying and tamping, when laying the next layer);
7), bearing capacity test report;
8), self-inspection, mutual inspection and process transfer of inspection records;
9), and other design requirements should be reported or submitted information.
Note: missing items, except reasonable.
(2), sand and gravel foundation inspection lot annexes should provide information on acceptance
1), certificate of quality raw materials (sand, stone);
2), sand, stone test report;