施工小结通用模式
××××××商住楼B幢施工总结
一、工程概况:
×××××××商住楼B幢工程,位于××市××路59号,该工程由×××实业公司投资兴建,由××建筑设计院设计,由××市地质工程勘察队进行该工程地质勘察,由××市建筑安装公司施工,由××市 ×× 建设工程监理有限公司监理。
综合按建筑面积6950m2,框架结构九层,建筑高度18.20,采用液压桩基础,桩径为350*350、400*400,桩长18~20m,单桩承载力650~850KN,桩承台标高-4.15米。主体为现浇钢筋砼结构,现浇柱截面由 × mm~ × mm不等,楼面砼板厚为100~150mm,墙体为180厚和120厚,采用MU10粘土砖,M7.5混合砂浆砌筑,外墙饰面贴60×240条形砖,内墙天花批荡,门窗采用白铝绿玻铝合金窗门和夹板门,水泥砂楼地面。屋面防水层采用面批1:2.5水泥砂浆20厚,扫SBS防水胶膜1.5厚,隔热层砌180砖架空钢筋砼板。该工程由2000年5月20日开工,于2001年11月10日竣工。
二、施工组织实施情况
我公司承接该工程土建施工任务后,先组织技术人员察看施
The general mode of construction Summary
×××××× commercial and residential buildings Construction Summary B
1, Project Overview:
××××××× commercial and residential buildings B project, located in × × × × Road 59 City, the project company by the × × × invest in the construction industry, from × × Architectural Design Institute, the × × City Geological Engineering Investigation geological survey of the project team by × × City Construction Construction and Installation Company, from × × × × City Construction Supervision Company Limited Supervision.
Integrated by building area 6950m2, nine-story frame structure, building height 18.20, hydraulic pile foundation, pile diameter of 350 * 350,400 * 400, the pile length 18 ~ 20m, bearing capacity of 650 ~ 850KN, pile cap elevation - 4.15 meters. Subject to cast reinforced concrete structure, cast column section by a × mm ~ × mm range, floor concrete thickness is 100 ~ 150mm, wall thickness and 120 to 180 thick, using MU10 brick, M7.5 mixed mortar masonry, wall finishes posted 60 × 240 bar tiles, interior wall plaster from ceilings, doors and windows with white aluminum alloy green glass windows and plywood doors, cement floor, ground sand. Surface layer of roofing cement batch 1:2.5 20 thick, sweeping SBS waterproof film 1.5 thick, insulating layer 180 blocks puzzle elevated reinforced concrete plate. The project by the May 20, 2000 started on November 10, 2001 completion.
Second, the implementation of construction organization
I undertake the civil works construction company mission, the first organization of technical personnel inspect the facilities
 