浙江某医院安装工程施工组织设计.doc
第一章 综合说明 2
第二章 工程概况和特点 5
Z3T-100 7
4DY-600 7
2.驻现场的工程技术、管理人员表 1
驻现场的工程技术、管理人员 1
姓名 1
本工程拟任岗位 1
年龄 1
性别 1
专 业学 历 1
专 业年 限 1
现任职务 1
和职称 1
安排上岗的 1
起止时间 1
类似工程的经历、业绩介绍 1
(或另附简历) 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
开工至竣工 1
注:1、我方和分包单位项目经理、技术负责、施工、质量、安全、材料、财务、合同以及各主要专业工种负责人均已列入。 1
2、列入本表人员的更换须经发包单位同意,擅自更换或不到位均属违约行为。 1
3.劳动力投入计划 1
3.1本工程前期施工劳动力主要来自于已竣工项目安装工程的劳动力。 1
3.2根据本工程特点面积广,在施工安装相对工期紧,故需保证安装高峰期人员的投入,同时加强班组管理,搞好综合平衡,做好连续均衡施工。 1
3.3到本工程安装高峰期时,须抽调劳动力,以保证本工程的施工进度。 1
3.4集中高素质施工班组,实行优质优价,经济管理为基础,努力提高劳动生产率。 1
3.5依靠先进技术,采用先进施工方法,提倡合理建议,节约用工,提高经济效益。 1
3.6劳动力投入计划表 (详见附表二) 1
劳动力投入计划表 2
2 126
1 126
Consolidated statement of Chapter 2
Chapter 5 Project Overview and Features
Z3T-100 7
4DY-600 7
2. In site engineering, management Table 1
In field engineering, management 1
Name 1
The project aspiring post 1
Age 1
Sex 1
Professional Qualifications 1
Professional 1-year limited
Current Position 1
And Title 1
Arrangements for induction of a
Duration 1
Experience of similar projects, introducing a performance
(Or attach resume) 1
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Start to completion of a
Note: 1, our sub-units and project managers, technical managers, construction, quality, safety, materials, finance, contracts and major responsible persons have been included in professional jobs. 1
2, included in this table is subject to contracting units to replace staff permission from the replacement or breach of contract are not in place. 1
3. Labor input scheme 1
3.1 The project pre-construction workers come from the project has been completed the installation of labor. 1
3.2 According to the engineering characteristics of an area, the construction and installation of a relatively short construction period, it is required to ensure the installation of the peak of staff input, while strengthening the team management, improving overall balance, well balanced continuous construction. 1
3.3 to the peak of the project installation, to be transferred workforce, to ensure the project's construction schedule. 1
3.4 The construction team focused on high-quality, quality products and favorable price, based on economic management, efforts to improve labor productivity. 1
3.5 rely on advanced technology, using advanced construction methods, to promote a reasonable proposal, save labor, increase economic efficiency. 1
3.6 The schedule of labor input (see Table 2) 1
Labor input schedule 2
2126
1 126
帮助中心 收藏 >>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附带注册机
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注册
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免费下载(简体中文版)
- 98144次
- 免费农村房屋设计图
- 90905次
- CAD2008注册机及使用说明
- 84340次
- 11g101图集全套下载
- 78882次
- cad图集大全
- 67445次
- 建筑工程施工组织设计范本
- 5300次
- ***高层施工组织设计
- 1831次
- 免费高层建筑施工组织设计
- 1790次
- 小高层施工组织设计
- 1473次
- 新校区综合楼工程施工组织设计
- 1458次
- 住宅楼工程施工组织设计
- 1344次
- 一类高层建筑施工组织设计
- 1335次
- 科嘉花园小区6、8、14、16、17#楼施工
- 1291次
- 施工组织设计方案
- 972次
- 免费超高层建筑施工组织设计方案实例
- 962次