一、工程概况及施工特点:
1.1设计概况:本工程为盐滩改造工程,由青岛市勘察测给研究院勘察,青岛鲁房建筑设计院设计。
1.2建筑概况:工程位于青岛市四方洛阳路,建筑面积:3889平方米,为五层住宅楼。其主要建筑做法如下:
1.2.1地面:混凝土水泥砂浆地面随打随抹,厕所为混凝土防潮地面。
1.2.2楼面:水泥楼面为主,厕所楼面设防水层。
1.2.3踢脚:防水砂浆踢脚。
1.2.4散水:混凝土水泥散水,面层随打随抹。
1.2.5内墙:水泥白灰砂浆抹光,外刷乳胶漆。
1.2.4天棚:水泥砂浆抹灰,外刷涂料。
1.2.5外墙:抹水泥砂浆,外刷涂料。
1.2.6门窗:铝合金窗,木制夹板门。
1.2.7屋面:屋面分为上人平屋面和贴瓦屋面二种,上人屋面采用水泥蛭石保温层,SBS防水面层铺地砖,贴瓦屋面采用珍珠岩保温层SBS防水,贴洋红色英红瓦。
3结构特点:本工程为框架结构,正副零以上采用M5混合砂浆砌MU7.5陶粒混凝土空心砌块,正副零以上框架部分为C30砼,浇楼板及其它构件为C20砼。其中一层设备用房与办公室隔墙为防火墙。
2工程特点及施工中应注意的问题:
2.1通过对招标资料的审学及施工现场的勘察,我们认为本工程有以下特点及施工中应注意的问题。
2.1.1本工程砼工程量较大,因此应严格控制砼的质量及标高,确保砼质量达到规范及设计要求。
二、工程指导总方针和工程的组织管理
2.1如果该工程由我公司中标,我公司将从人力、物力、技术等方面组织骨干力量,使用先进机械设备,投足
1, Project Overview and construction features:
1.1 Design Overview: This project is for the salt beach renovation project, measured by the survey to the Qingdao Institute of Investigation, the Housing Architectural Design Institute, Qingdao Lu.
1.2 Architectural Overview: Project is located in Qingdao City Quartet Luoyang Road, Building area: 3889 square meters, for the five-story residential buildings. The main building practices are as follows:
1.2.1 Ground: concrete floor with cement mortar to play with the wipes, toilet for the concrete damp ground.
1.2.2 Floor: cement floor main bathroom floor with Waterproof Layer.
1.2.3 kick: waterproof mortar kick.
1.2.4 Bulk water: concrete cement bulk water, with the playing surface with the wipe.
1.2.5 Interior: cement mortar mortar trowel, paint brush outside.
1.2.4 Ceiling: Cement mortar plastering, paint brush outside.
1.2.5 external: using concrete and mortar, outside the paint brush.
1.2.6 Doors and windows: Aluminium windows, wooden door plywood.
1.2.7 Roof: Roof Master level into two kinds of roofing and paste tile roof, the Master of cement roof with vermiculite thermal insulation, SBS waterproof surface flooring, posted tile roof with pearlite insulation SBS waterproof, paste magenta British red tiles.
Three structural characteristics: the framework of the project structure and zero or more deputy M5 mixed with mortared MU7.5 ceramic concrete hollow block, and vice-part framework above zero C30 concrete, poured floors and other components for the C20 concrete. One level equipment room and office wall as a firewall.
2 projects in construction characteristics and problems:
2.1 Through the review of information science and tender the construction site of the investigation, we believe that this project has the following characteristics and problems in construction.
2.1.1 The quantities of concrete works, so the quality should be strictly controlled and the level of concrete to ensure quality concrete to specification and design requirements.
Second, the general principle guiding construction and engineering organization and management
2.1 If the successful bidder of the project by my company, my company from the human, material, technology, and organizational backbone of the use of advanced machinery and equipment, required to cast