新北五期农迁房J组团施工组织设计(新北小区).doc
第一部分 编制依据及工程概况
第一章 编制依据及说明
第一节 编制说明
一、本着对工程质量的高度责任感和对业主负责,以达到合理利用发包人资金,确保工程“质量优、速度快、造价低、操作性强,我们编制的原则是:“经济、合理、优质、高效”。我们针对本工程设计特点和功能要求,以严谨的科学态度向建设单位提供的优质服务和保证质量、工期等方面最优化的建议。
二、本工程施工组织设计是严格按照工程招标范围和招标文件及施工组织设计的要求进行质量策划后编制的,在人员、机械、材料调配、施工方案、质量要求,进度安排等方面统一部署的原则下,由土建、安装及装饰等专业组成。
三、对本工程的投标《施工组织设计》编制,公司予以高度重视并大力支持。公司由总工程师组织施工技术科、预算科、工程项目经理、项目技术负责人以及公司机关和施工现场的技术人员共同研究、认真领会工程设计意图,并进行现场踏勘。在此基础上,我们编制了该方案,尤其对关键、重点及特殊部位的施工方案的编制详实、具体,确保该《施工组织设计》重点突出、针对性和可操作性强。
四、本施工组织设计的编制内容是依据四川省纺织工业设计院提供的工程施工图及同类工程的相关经验编制的。我们在
The basis for preparing the first part and the project profiles
Chapter Basis and Description
Section preparation instructions
1, in the spirit of engineering and quality Di strong sense of responsibility on the owner is responsible, in order to achieve a reasonable use of contracting human capital, Quebao works "Zhiliang excellent, high speed, low cost, feasible, Womenbianzhi principle is:" economical, reasonable high quality and efficiency. "we focused on the engineering design features and functional requirements to rigorous scientific approach to the building of units of quality services and ensure the quality, duration, etc. The most optimal proposal.
Second, the construction organization design is strictly in accordance with the scope of project bidding and tender documents and construction organization design requirements for quality planning and compiled, in personnel, machinery, materials allocation, construction programs, quality requirements, schedule and so unified arrangements of the principle, by the civil works, installation and decoration professions.
Third, bid on the project "Construction organization design" establishment, the company attaches great importance to and strongly supported. Chief engineer of construction company by the Technology Section, Budget Section, the project manager, project technical managers and corporate bodies and the construction site technical staff to study seriously and understand the engineering design intent, and carry out field investigation. On this basis, we developed the program, especially for critical priorities and special parts of the preparation of detailed construction plan, specifically, to ensure that the "construction organization design" focused, targeted and highly feasible.
4, preparation of the construction organization design is based on the content of Textile Industry Design Institute to provide the engineering construction plans and relevant experience of similar projects prepared. We