威海市万达生活小区施工组织设计.doc
目录
一、编制依据
二、工程概况
三、工程自然条件
四、施工进度计划
五、工程施工管理目标确定
六、施工部署
七、劳动力需用量计划
八、机械设备需用量计划
九、施工准备
十、施工总平面布置
十一、主要分部分项工程施工方法
十二、冬期、雨期施工措施
十三、各项组织保证措施
1、质量管理措施
2、职业健康/安全管理措施
3、文明施工管理措施
4、环境保护措施
5、消防措施
6、预防传染病措施
十四、“四新”技术应用
十五、工程回访与保修
十六、 以下是附图和附表
Directory
1, prepared on the basis
Second, project profiles
Third, project the natural conditions
Fourth, the construction schedule
5, targeting construction management
6, construction deployment
7, the amount of labor required to plan
8, mechanical equipment required amount of program
9, construction preparation
10, construction general layout
11, part of the main sub-project construction method
12, winter, rain on the construction measures
13, the organization assurance measures
1, Quality management
2, occupational health / safety measures
3, civilized construction management
4, environmental protection measures
5 Fire fighting measures
6, disease prevention measures
14, "four new" technology
15, re-engineering and warranty
16, the following are photos and details