施工组织设计
第一节  施工总平面布置
施工总平面布置合理与否,将直接关系到施工进度的快慢和安全文明施工管理水平的高低。为保证现场施工顺利进行,具体的施工平面布置原则为:                       
1.满足施工的前提下,尽量节约施工用地;
2.在满足施工需要和文明施工的前提下,合理布置材料堆场;
3.尽可能避免土建、安装相互干扰;
4.符合施工现场卫生及安全技术要求和防火规范;
根据以上原则施工现场布置有:临时围墙、临时办公住房、施工道路、给排水、电、混凝土搅拌机、灰浆搅拌机、钢筋加工车间、模板加工车间、标准养护室、灯塔等(详见施工总平面图)。
第二节  测量方案
1.测量设备选用及测量程序
现场配备1台全站仪、2台J2 光学经纬仪和2台DZS3 水准仪、两把50米钢卷尺。
2.测量控制网点标桩
根据施工测量的需要和市规划局提供的水准点结合现场的情况,水准点需引测的按三等水准测量的要求引测一组便于施工、通视较好、基本等距的等边三角水准点于现场,并设置保护桩保护起来,而且还要不定期检查,确保精度,水准点安装方法如图。
本工程施工测量控制网点标桩的埋设采用现浇钢筋混凝土标桩形式,标桩埋深在2~3m,高出地面约300mm.,在标桩的顶部埋设100×100mm的不锈钢标板,在Construction Design
Section I construction general layout
Construction of the general layout is reasonable or not, will have a direct bearing on the pace of construction progress and safety of civilization, the level of construction management. In order to ensure the smooth progress of site construction, concrete construction layout principles are:
1. Satisfy the premise of construction, saving as much as possible construction sites;
2. In meeting the needs and civil construction works under the premise of rational arrangement of material storage yard;
3. As far as possible to avoid civil works, installation of mutual interference;
4. Meet the construction site health and safety requirements and fire safety;
According to this principle the construction site layout are: temporary wall, temporary housing, office and construction roads, drainage, electricity, concrete mixers, mortar mixers, steel processing plant, the template processing workshop, standard curing room, lighthouse etc. (see Construction Map) .
Section measurement program
1. Measurement equipment and measurement procedures used
Site with a total stations, 2 J2 2 sets of optical theodolite and DZS3 Level, 2 50 m steel measuring tape.
2. Survey Control Network stake
Under construction survey Di needs and standards of the Urban Planning Bureau According to the field point of the situation, the standard Points would need to Yin measured An Third Order Leveling Yaoqiu Yinceyizu easy construction, Tongshi good, the other Bian Ji Ben equidistant triangle standard point in the scene and set up protection of pile protection, but also occasional checks to ensure the accuracy, quality point of installation method shown in Figure.
The construction survey control network using standard pile of buried cast reinforced concrete stakes forms, stakes depth in the 2 ~ 3m, above the ground about 300mm., Laid on top of piles in the standard 100 × 100mm stainless standard plates in

 