第一卷 混合结构多层住宅搂工程施工组织设计
第一章 工程概况
 本工程是几家工厂合建的四栋住宅楼,每栋均为四个单元组合,五层,采用标准图,每栋面积为3403m2,共计13612m2。
 每栋建筑物采用甲—乙—甲—丁四单元组合,总长62.02m,宽10.22m,层高2.90m,全高15.29m。开间为2.70m、3.00m、3.30m三种。进深为4.80m、5.02m二种。室内±0.00绝对标高从35.75至35.90m,每两栋相差0.15m,室内外高差均为0.60m。
 现场地势高低不平,并有旧房屋拆除后的基础,自然地坪为35.05m至35.20m,低于室外绝对标高。根据地质钻探资料,现场地下水位较低,故施工时基础底部不会出现地下水,可不考虑排水措施。基础持力层为粉质粘土。
 基础为刚性基础,天然地基,地基上为450mm厚3:7灰土,砖砌大放脚。基底标高在-2.20m至-2.60m之间,-0.90m处有一道钢筋混凝土圈梁。建筑物按8度抗震设防设计,结构为砖墙承重,外墙370mm,内墙240mm,隔断墙120mm,单元四个大角、楼梯间、内外墙交接处、楼梯间两侧墙均设抗震组合柱。每层设置圈梁。楼板为预应力圆孔板,屋顶板为加气混凝土屋面板,预制混凝土挑檐板。屋面为二毡三油防水作法。
 外檐以清水墙为主,仅檐口、楼梯间、阳台栏板为干粘石面层。内檐除厨厕为1.2m高水泥墙裙外,其余均为白灰抹面,120mm踢脚板,顶板勾缝喷浆,楼面为35mm豆石混凝土抹面,木门、钢窗。
 设备有上、下水,暖气、照明,每个单元配水、电表各一个。室外管线均接通至小区干线。

Vol-rise residential mixed brush structure construction organization design
Chapter Project Overview
 The project is jointly built by several factories 4 residential building, a complete circuit of the four units are combined, five-story, standard map, a complete circuit of an area of 3403m2, a total of 13612m2.
 Each building with A - B - A - Ding four units combined, length 62.02m, width 10.22m, storey 2.90m, full-height 15.29m. Bay is 2.70m, 3.00m, 3.30m of three. Into the deep 4.80m, 5.02m two. Indoor absolute elevation from 35.75 ± 0.00 to 35.90m, a difference of every two 0.15m, the height difference inside and outside are 0.60m.
 Field rugged terrain and have the foundation after the demolition of old housing, natural floor to 35.05m to 35.20m, lower than outdoor absolute elevation. According to geological drilling data, the lower the groundwater level on site, so construction will not be based on the bottom of the ground water, drainage measures from time to consider. Bearing layer is silty clay.
 Basis for the rigid foundation, the natural foundation, the foundation for the 450mm thick 3:7 lime, brick big up leg. Base elevation to-2.60m-2.20m in between,-0.90m Department has a reinforced concrete ring beam. Building by 8 degree earthquake design load-bearing brick wall structure, wall 370mm, internal walls 240mm, partition wall 120mm, Unit 4 Cape, staircases, internal and external wall junction, staircases, columns on both sides of the wall are equipped with seismic . Ring beam on each floor. Hole to prestressed floor panels, roof panels for the roof of aerated concrete, precast concrete eaves board. Roofing felt for the two three oil waterproofing practices.
 Wai Yan wall with water-based, only cornices, staircase, balcony railing to dry sticky stone surface. In addition to kitchen and toilet within the eaves is 1.2m high concrete wall panels, the rest are white ash Plastering, 120mm skirting board, roof pointing shotcrete, concrete floor for the 35mm pisolite Plastering, wooden doors, steel window.
 Equipment, the water, heating, lighting, water distribution per unit, each one meter. Outdoor pipes are connected to the cell lines.