TSP实例分析.doc
2007年01月18日,中铁**局集团**铁路指挥部地质预测预报中心对***隧道出口正洞DK126+906~DK126+756范围内地质情况进行了探测。本次探测采用TSP 203仪器进行资料采集。激发20炮,炮点距1.5m,一个接收器置于隧道左边墙DK127+120处接收,采集参数为:采样率62.5μs,记录长度7218样点,X-Y-Z三分量接收。采集时炮眼深度1.5米,采用膨胀剂堵塞。接收器深度为2米,套筒与岩石耦合状况良好,系统工作正常。
January 18, 2007, China Railway Group ** ** Board Railway headquarters Geological Forecasting Center *** Tunnel are holes DK126 +906 ~ DK126 +756 carried out within the scope of geological exploration. The detection equipment used for data collection TSP 203. Excitation of 20 guns, artillery dot pitch of 1.5m, a receiver placed in the tunnel on the left wall of DK127 +120 office reception, acquisition parameters were: sampling rate 62.5μs, record length of 7218 samples, XYZ three-component receivers. Collection depth of 1.5 meters when the borehole, blocked with expansive agent. Receiver depth of 2 meters, coupling sleeve and the rock is good, the system is working properly.
帮助 收藏 报错 评论>> |
本类栏目导航
总点击排行
- 天正建筑2013最新64位破解版
- 160530次
- Autocad2013 64位32位破解版附带注册机
- 148311次
- 天正建筑8.5破解版
- 144045次
- autocad2012 64位32位 破解版(附注册
- 137474次
- 天正建筑8.2破解版
- 123394次
- autocad2010免费下载(简体中文版)
- 97140次
- CAD2008注册机及使用说明
- 80809次
- 免费农村房屋设计图
- 73728次
- cad图集大全
- 56763次
- 11g101图集全套下载
- 45305次
- 用钢管桩和贝雷片做现浇箱梁施工支架施
- 433次
- 桥梁钻孔灌注桩施工现场旁站监理检测记
- 428次
- 工程机械台班费汇编
- 418次
- 高速铁路论文集
- 402次
- 公路水下水泥混凝土水中抗分离剂应用技
- 402次
- 预应力混凝土组合箱梁桥损伤识别方法研
- 402次
- 桥梁博士小工具
- 401次
- 最新路桥专业交通部的试验检测工程师复
- 401次
- 300-350kmh双线隧道内轮廓-2011-01-10
- 401次
- 桥梁主梁节段模型三分力系数风洞试验研
- 401次